[1]ZHANG L, LUO Y L, TAO F, et al. Cloud manufacturing: A new manufacturing paradigm[J]. Enterprise Information Systems, 2014, 8(2): 167-187.
[2]CAO Y, WANG S L, KANG L, et al. A TQCS-based service selection and scheduling strategy in cloud manufacturing[J]. International Journal of Advanced Manufacturing Technology, 2016, 82: 235-251.
[3]ZHANG M, LI C Q, SHANG Y L, et al. Research on resource service matching in cloud manufacturing[J]. Manufacturing Letters, 2018, 15: 50-54.
[4]FISHER O, WATSON N, PORCU L, et al. Cloud manufacturing as a sustainable process manufacturing route[J]. Journal of Manufacturing Systems, 2018, 47: 53-68.
[5]周金宏, 汪定伟. 软计算求解分布式多工厂单件制造业的提前/拖期生产计划问题[J]. 控制理论与应用, 2002, 19(2): 235-238.
ZHOU Jinhong, WANG Dingwei. Soft computing for earliness and tardiness production planning of multi-location OKP manufacturing systems[J]. Control Theory & Applications, 2002, 19(2): 235-238.
[6]KARIMI N, DAVOUDPOUR H. A branch and bound method for solving multi-factory supply chain scheduling with batch delivery [J]. Expert Systems with Applications, 2015, 42: 238-245.
[7]王文浩, 张洁. 面向ATP的多工厂订单决策与生产计划集成优化模型[J]. 上海交通大学学报, 2011, 45(12): 1794-1799.
WANG Wenhao, ZHANG Jie. An order decision and production planning integrated available-to-promise model for multi-plant manufacturing[J]. Journal of Shanghai Jiao Tong University, 2011, 45(12): 1794-1799.
[8]PAN T Y, ZHANG Z H, CAO H. Collaborative production planning with production time windows and order splitting in make-to-order manufacturing[J]. Computer & Industrial Engineering, 2014, 67: 1-9.
[9]LU Y Q, XU X. Process and production planning in a cloud manufacturing environment[C]∥Proceedings of the ASME 2015 International Manufacturing Science and Engineering Conference. Charlotte, USA: MSEC, 2015: 9382.
[10]王占中, 赵利英, 曹宁博. 基于多层编码遗传算法的危险品运输调度模型[J]. 吉林大学学报(工学版), 2017, 47(3): 751-755.
WANG Zhanzhong, ZHAO Liying, CAO Ningbo, et al. Hazardous material transportation scheduling model based on multilayer coding genetic algorithm[J]. Journal of Jilin University (Engineering and Technology Edition), 2017, 47(3): 751-755.
[11]BRAHIMI N, DAUZERE-PERES S, WOLSEY L A. Polyhedral and Lagrangian approaches for lot sizing with production time windows and setup times[J]. Computers & Operations Research, 2010, 37(1): 182-188. |