Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability

Expand
  • (1. MOT Key Laboratory of Transport Industry of Big Data Application Technologies for Comprehensive Transport, Beijing Jiaotong University, Beijing 100044, China; 2. CHELBI Engineering Consultants, Inc., Beijing 100029, China; 3. Beijing Transport Institute, Beijing 100073, China)

Online published: 2019-07-29

Abstract

As an effective means for improving system condition and reducing failures, a reasonable preventive maintenance scheduling guarantees the stability and safety of the system. This paper studies a consecutive maintenance scheduling problem for single-component systems with imperfect maintenance, and an optimum model with minimum reliability constraint for minimal cost rate is developed based on the renewal theory. The agebased and reliability-based maintenance strategies are modeled and compared according to a numerical example based on the degradation data of the actual system, which also verifies the optimality of the reliability-based strategy. At last, the influence of some key parameters is discussed by sensitive analysis.

Cite this article

LIU Gehui (刘葛辉), LONG Xiangyu (龙翔宇), TONG Shuo (仝硕), ZHANG Rui (张瑞), CHEN Shaokuan* (陈绍宽) . Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability[J]. Journal of Shanghai Jiaotong University(Science), 2019 , 24(4) : 490 -495 . DOI: 10.1007/s12204-019-2089-z

References

[1] EL-FERIK S. Economic production lot-sizing for anunreliable machine under imperfect age-based maintenancepolicy [J]. European Journal of Operational Research,2008, 186(1): 150-163. [2] BROWM M, PROSCHAN F. Imperfect repair [J].Journal of Applied Probability, 1983, 20(4): 851-859. [3] OUYANG Y, MADANAT S. Optimal scheduling of rehabilitationactivities for multiple pavement facilities:Exact and approximate solutions [J]. TransportationResearch Part A: Policy and Practice, 2004, 38(5):347-365. [4] CHEN S K, PENG H Q, MAO B H, et al. Optimizationmodel of least-cost-based maintenance schedules forrailway traction substations [J]. Journal of the ChinaRailway Society, 2011, 33(8): 39-44 (in Chinese). [5] NAKAGAWA T. Sequential imperfect preventivemaintenance policies [J]. IEEE Transactions on Reliability,1988, 37(3): 295-298. [6] MALIK M A K. Reliable preventive maintenancescheduling [J]. AIIE Transactions, 1979, 11(3): 221-228. [7] ZHAO Y C. Optimum maintenance scheduling for locomotivesthrough preventive maintenance strategy[D]. Beijing: Beijing Jiaotong University, 2016.
Outlines

/