Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability

  • CHEN Shaokuan* (陈绍宽) ,
  • LIU Gehui (刘葛辉) ,
  • LONG Xiangyu (龙翔宇) ,
  • TONG Shuo (仝硕) ,
  • ZHANG Rui (张瑞)
Expand
  • (1. MOT Key Laboratory of Transport Industry of Big Data Application Technologies for Comprehensive Transport, Beijing Jiaotong University, Beijing 100044, China; 2. CHELBI Engineering Consultants, Inc., Beijing 100029, China; 3. Beijing Transport Institute, Beijing 100073, China)

Online published: 2019-07-29

Abstract

As an effective means for improving system condition and reducing failures, a reasonable preventive maintenance scheduling guarantees the stability and safety of the system. This paper studies a consecutive maintenance scheduling problem for single-component systems with imperfect maintenance, and an optimum model with minimum reliability constraint for minimal cost rate is developed based on the renewal theory. The agebased and reliability-based maintenance strategies are modeled and compared according to a numerical example based on the degradation data of the actual system, which also verifies the optimality of the reliability-based strategy. At last, the influence of some key parameters is discussed by sensitive analysis.

Cite this article

CHEN Shaokuan* (陈绍宽) , LIU Gehui (刘葛辉) , LONG Xiangyu (龙翔宇) , TONG Shuo (仝硕) , ZHANG Rui (张瑞) . Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability[J]. Journal of Shanghai Jiaotong University(Science), 2019 , 24(4) : 490 -495 . DOI: 10.1007/s12204-019-2089-z

References

[1] EL-FERIK S. Economic production lot-sizing for anunreliable machine under imperfect age-based maintenancepolicy [J]. European Journal of Operational Research,2008, 186(1): 150-163. [2] BROWM M, PROSCHAN F. Imperfect repair [J].Journal of Applied Probability, 1983, 20(4): 851-859. [3] OUYANG Y, MADANAT S. Optimal scheduling of rehabilitationactivities for multiple pavement facilities:Exact and approximate solutions [J]. TransportationResearch Part A: Policy and Practice, 2004, 38(5):347-365. [4] CHEN S K, PENG H Q, MAO B H, et al. Optimizationmodel of least-cost-based maintenance schedules forrailway traction substations [J]. Journal of the ChinaRailway Society, 2011, 33(8): 39-44 (in Chinese). [5] NAKAGAWA T. Sequential imperfect preventivemaintenance policies [J]. IEEE Transactions on Reliability,1988, 37(3): 295-298. [6] MALIK M A K. Reliable preventive maintenancescheduling [J]. AIIE Transactions, 1979, 11(3): 221-228. [7] ZHAO Y C. Optimum maintenance scheduling for locomotivesthrough preventive maintenance strategy[D]. Beijing: Beijing Jiaotong University, 2016.
Outlines

/