Journal of Shanghai Jiao Tong University (Science) ›› 2017, Vol. 22 ›› Issue (6): 664-671.doi: 10.1007/s12204-017-1888-3
Previous Articles Next Articles
WANG Hongdonga (王鸿东), LI Danb* (李丹), YI Honga (易宏)
Online:
2017-12-01
Published:
2017-12-03
Contact:
LI Dan (李丹)
E-mail:danli313@sjtu.edu.cn
CLC Number:
WANG Hongdonga (王鸿东), LI Danb* (李丹), YI Honga (易宏). Optimal Allocation of Fleet’s Spare Parts for System Reliability[J]. Journal of Shanghai Jiao Tong University (Science), 2017, 22(6): 664-671.
[1] | KENNEDYW J, PATTERSON J W, FREDENDALL L D. An overview of recent literature on spare parts inventories[J]. International Journal of Production Economics,2002, 76(2): 201-215. |
[2] | AHMAD R, KAMARUDDIN S. An overview of timebased and condition-based maintenance in industrial application [J]. Computers & Industrial Engineering,2012, 63(1): 135-149. |
[3] | MOON S, HICKS C, SIMPSON A. The development of a hierarchical forecasting method for predicting spare parts demand in the South Korean Navy—A case study [J]. International Journal of Production Economics,2012, 140(2): 794-802. |
[4] | FENG Y, YIN D, LUO B. Forecasting model for spare parts with intermittent demand based on SES [J].Ordnance Industry Automation, 2011, 30(2): 18-21 (in Chinese). |
[5] | SHERBROOKE C C. Vari-metric: Improved approximations for multi-indenture, multi-echelon avalibility models [J]. Operations Research, 2017, 34(2):311-319. |
[6] | MUCKSTADT J A. A model for a multi-item, multiechelon,multi-indenture inventory system [J]. Management Science, 1973, 20(4): 472-481. |
[7] | HILLESTAD R J. Dyna-METRIC: Dynamic multiechelon technique for recoverable item control [R]. US:RAND Corporation, 1982, |
[8] | GRAVES S C. A multi-echelon inventory model for a repairable item with one-for-one replenishment [J].Management Science, 1985, 31(10): 1247-1256. |
[9] | RUSTENBURG W D, HOUTUM G J, ZIJM W H M. Spare parts management at complex technologybased organizations: An agenda for research [J]. International Journal of Production Economics, 2001,71(1/2/3): 177-193. |
[10] | CAI Z M, JIN J S, CHEN Y Q. Warship formation spare parts allotment optimization method under multi-constraints [J]. Systems Engineering and Electronics,2015, 37(4): 838-844 (in Chinese). |
[11] | YU X. Application of OPUS 10 in formulation of ship’s initial spare parts list [J]. Equipment Manufacturing Technology, 2014, 12: 141-143 (in Chinese). |
[12] | WONG H, HOUTUM G J, CATTRYSSE D, et al.Multi-item spare parts systems with lateral transshipments and waiting time constraints [J]. European Journal of Operational Research, 2006, 171(3): 1071-1093. |
[13] | YI H. Research on ship’s general reliability model and reliability engineering methods [D]. Shanghai: Shanghai Jiao Tong University, 2003. |
[14] | YOON K B, SOHN S Y. Finding the optimal CSP inventory level for multi-echelon system in air force using random effects regression model [J]. European Journal of Operational Research, 2007, 180(3): 1076-1085. |
[15] | WANG H D, YI H, LIANG X F, et al. Analysis of the research status of ship spare parts allocation [J].Chinese Journal of Ship Research, 2016, 11(4):133-140(in Chinese). |
[16] | LIANG X F, YI H, ZHANG Y F, et al. Numerical simulation to reliability analysis of fault-tolerant repairable system [J]. Journal of Shanghai Jiao Tong University, 2010, 15(5): 526-534. |
[17] | BAO X, JI J H, LIAN H J. The ordering policy and model for critical spare part [J]. Journal of Shanghai Jiao Tong University, 2007, 41(7): 1097-1101 (in Chinese). |
[18] | YI H, YUAN Y. Numerical simulation based on the minim cut sets of faulty tree [J]. Journal of Shanghai Jiao Tong University, 1997, 31(9): 117-121 (in Chinese). |
[19] | LIANG X F, YI H, ZHANG Y F, et al. Reliability and safety analysis of an underwater dry maintenance cabin [J]. Ocean Engineering, 2010, 37(2/3): 268-276. |
[20] | BARABADY J, KUMAR U. Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran [J]. Reliability Engineering & System Safety, 2008, 93(4): 647-653. |
[1] | YE Hongqing, SU Huade, ZHENG Meimei, XIA Tangbin. Joint Optimization of Replacement and Spare Parts Ordering with Dual Sourcing [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1359-1367. |
[2] | YANG Zhiyuan, ZHAO Jianmin, CHENG Zhonghua, GUO Chiming, LI Liying. Optimization Model of Maintenance and Spare Parts Ordering Policy in Multivariate Degradation System [J]. Journal of Shanghai Jiao Tong University, 2021, 55(7): 858-867. |
[3] | GAO Yingming, CHEN Zhen, ZHANG Xiufang, PAN Ershun. Reliability Modeling and Maintenance Optimization of Manufacturing System Based on Stochastic Flow Network and Markov Process [J]. Journal of Shanghai Jiao Tong University, 2021, 55(3): 229-235. |
[4] | ZHANG Shuai (张帅), Lü Ruoning (吕若宁), SI Shubin (司书宾), REN Fangyu (任方宇). Reliability Analysis of Systems with Common Cause Failure Based on Stress-Strength Interference Model [J]. Journal of Shanghai Jiao Tong University (Science), 2018, 23(5): 707-710. |
[5] | JIN Jiashan (金家善), CAI Zhiming* (蔡芝明), CHEN Yanqiao (陈砚桥). Warship Spare Parts Configuration Optimization for Stock Control: Investigating the Gap Between Qualitative and Quantitative Constraints [J]. Journal of shanghai Jiaotong University (Science), 2017, 22(4): 440-448. |
[6] | Wang Y.; Gu H.; Zhao J.; Cheng Z.. Modeling on spare parts inventory control under condition based maintenance strategy [J]. J Shanghai Jiaotong Univ Sci, 2016, 21(5): 600-604. |
[7] | Mi J.; Li Y.; Peng W.; Yang Y.; Huang H.. Fault tree analysis of feeding control system for computer numerical control heavy-duty horizontal lathes with multiple common cause failure groups [J]. J Shanghai Jiaotong Univ Sci, 2016, 21(4): 504-508. |
[8] | Liu B.; An Z.; Kou H.. Wind turbine gearbox reliability analysis based on the system level stress-strength model [J]. J Shanghai Jiaotong Univ Sci, 2016, 21(4): 484-488. |
[9] | YANG Qiu-ping1* (杨秋平), ZHANG Hao2 (张 皞), SANG Hui-yun2 (桑惠云), XIE Xin-lian2 (谢新连). Mathematical Approach for Fleet Planning Under Complicated Circumstances [J]. Journal of shanghai Jiaotong University (Science), 2014, 19(2): 241-250. |
[10] | ZHANG Jing1 (章 菁), ZHENG Xi-tao3 (郑西涛), YU Ye-hua2 (俞夜花),ZHANG Yong-wei2 (张永伟), YANG Kun3 (杨 堃), SHI Jun2* (石 军). Network Structure and Reliability Analysis of a New Integrated Circuit Card Payment System for Hospital [J]. Journal of shanghai Jiaotong University (Science), 2013, 18(5): 630-633. |
[11] | WANG Rui-1, LEI Hong-Wei-1, PENG Ying-Wu-2, LI Qing-Min-2, QI Yong-Qiang-1. Optimization of Warship Spare Parts in the Scenario of Wartime Mission [J]. Journal of Shanghai Jiaotong University, 2013, 47(03): 398-403. |
[12] | LIU Tian-Tang, JIANG Zhi-Bin, GENG Na, LIU Ran, LIU Shu-Jun. The Heterogeneous Fixed Fleet Capacitated Arc Routing Problem [J]. Journal of Shanghai Jiaotong University, 2012, 46(11): 1759-1763. |
[13] | WANG Fang, WAN Lei, JIANG Da-Peng, XU Yu-Ru. Design and Analysis of DP-3 Dynamic Positioning Control System Based on Vxworks [J]. Journal of Shanghai Jiaotong University, 2012, 46(02): 217-222. |
Viewed | ||||||||||||||||||||||||||||||||||||||||||||||||||
Full text 701
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||
Abstract 826
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||