[1] |
WUM, CHAUKW, SHENQP, et al. Net asset valuebased concession duration model for BOT contracts[J]. Journal of Construction Engineering and Management,2012, 138(2): 304-308.
|
[2] |
SHEN L Y, WU Y Z. Risk concession model for build/operate/transfer contract projects [J]. Journal of Construction Engineering and Management, 2005,131(2): 211-220.
|
[3] |
SHEN L Y, LI H, LI Q M. Alternative concession model for build operate transfer contract projects[J]. Journal of Construction Engineering and Management,2002, 128(4): 326-330.
|
[4] |
NG S T, XIE J Z, CHEUNG Y K, et al. A simulation model for optimizing the concession period of publicprivate partnerships schemes [J]. International Journal of Project Management, 2007, 25(8): 791-798.
|
[5] |
ZHANG X Q. Win-win concession period determination methodology [J]. Journal of Construction Engineering and Management, 2009, 135(6): 550-558.
|
[6] |
WANG D B, SONG J B, DAI D S, et al. A decision method of concession period for traffic projects in a build-operate-transfer scheme [C]// Proceedings of 2009 International conference on Management Science & Engineering. Moscow: IEEE, 2009: 1935-1941.
|
[7] |
HANAOKA S, PALAPUS H P. Reasonable concession period for build-operate-transfer road projects in the Philippines [J]. International Journal of Project Management,2012, 30(8): 938-949.
|
[8] |
YU C Y, LAM K C. A decision support system for the determination of concession period length in transportation project under BOT contract [J]. Automation in Construction, 2013, 31: 114-127.
|
[9] |
MOSTAFA K, FARNAD N, MAJID A. Using fuzzydelphi technique to determine the concession period in bot projects [C]// Proceedings of 2010 2nd IEEE International Conference on Information and Financial Engineering. Chongqing: IEEE, 2010: 442-446.
|
[10] |
YANG H W, ZHOU J, HE J M. Decision-making model on concession term for traffic BOT project on the basis of game theory [J]. Journal of Industrial Engineering and Engineering Management, 2003, 17(2):93-95 (in Chinese).
|
[11] |
SHEN L Y, BAO H J,WU Y Z, et al. Using bargaininggame theory for negotiating concession period for BOT-type contract [J]. Journal of Construction Engineering and Management, 2007, 133(5): 385-392.
|
[12] |
YANG Y, GUO M L, HU W X. Option game analysis of concession term for BOT projects in environmental protection infrastructure [J]. China Population Resources and Environment, 2007, 17(2): 32-35 (in Chinese).
|
[13] |
ZHAO L L, TAN D Q. Analysis on concession term decisions of BOT projects based on social benefits[J]. Journal of Industrial Engineering and Engineering Management, 2009, 23(2): 125-130 (in Chinese).
|
[14] |
QIN X. Quantitative concession period model for build operate transfer contract project on CAPM [J]. Journal of Industrial Engineering and Engineering Management,2005, 19(2): 60-63 (in Chinese).
|
[15] |
WU M. Modeling depreciation costs and BOT concession period [C]// Proceedings of the 16th International Symposium on Advancement of Construction Management and Real Estate. Chongqing: CRIOCM, 2011:112-117.
|
[16] |
WU M. Improving the 1st critical point in BOTCcM[C]// Proceedings of the 16th International Symposium on Advancement of Construction Management and Real Estate. Chongqing: CRIOCM, 2011: 118-124.
|
[17] |
HU H, ZHU Y H. Social welfare-based concession model for build/operate/transfer contracts [J]. Journal of Construction Engineering and Management, 2015,141(1): 1-5.
|