[1] |
YANG S J, YANG D L. Minimizing the totalcompletion time in single-machine scheduling withaging/deteriorating effects and deteriorating maintenanceactivities [J]. Computers and Mathematics withApplications, 2010, 60(7): 2161-2169.
|
[2] |
MOLAEE E, MOSLEHI G, REISI M. Minimizingmaximum earliness and number of tardy jobs in thesingle machine scheduling problem with availabilityconstraint [J]. Computers and Mathematics with Applications,2011, 62(9): 3622-3641.
|
[3] |
CUI W W, LU Z Q. Integrating production schedulingand preventive maintenance planning for a singlemachine [J]. Journal of Shanghai Jiaotong University,2012, 46(12): 2009-2013 (in Chinese).
|
[4] |
LEE C Y. Machine scheduling with an availabilityconstraint [J]. Journal of Global Optimization, 1996,9(3): 395-416.
|
[5] |
LIAO L W, GWO J S. Parallel machine schedulingwith machine availability and eligibility constraints[J]. European Journal of Operational Research, 2008,184(2): 458-467.
|
[6] |
KUBZIN M A, POTTS C N, STRUSEVICH V A.Approximation results for flow shop scheduling problemswith machine availability constraints [J]. Computers& Operations Research, 2009, 36(2): 379-390.
|
[7] |
HSU C J, LOW C, SU C T. A single-machinescheduling problem with maintenance activities tominimize makespan [J]. Applied Mathematics andComputation, 2010, 215(11): 3929-3935.
|
[8] |
XU D H, YANG D L. Makespan minimization fortwo parallel machines scheduling with a periodic availabilityconstraint: Mathematical programming model,average-case analysis, and anomalies [J]. Applied MathematicalModelling, 2013, 37(14): 7561-7567.
|
[9] |
QI X, CHEN T, TU F. Scheduling the maintenanceon a single machine [J]. Journal of the Operational ResearchSociety, 1999, 50(10): 1071-1078.
|
[10] |
CHEN J S. Scheduling of non resumable jobs and flexiblemaintenance activities on a single machine to minimizemakespan [J]. European Journal of OperationalResearch, 2008, 190(1): 90-120.
|
[11] |
LEE C Y, CHEN Z L. Scheduling of jobs and maintenanceactivities on parallel machines [J]. Naval ResearchLogistics, 2000, 47(2): 85-183.
|
[12] |
SUN K B, LI H X. Scheduling problems with multiplemaintenance activities and non-preemptive jobs on twoidentical parallel machines [J]. International Journal ofProduction Economic, 2010, 124(1): 151-158.
|
[13] |
XU D H, SUN K B, LI H X. Parallel machinescheduling with almost periodic maintenance and nonpreemptivejobs to minimize makespan [J]. Computers& Operations Research, 2008, 35(4): 1344-1349.
|
[14] |
JI M, HE Y, CHEN T C E. Single-machine schedulingwith periodic maintenance to minimize makespan[J]. Computers & Operations Research, 2007, 34(6):1764-1770.
|