[1] |
KENNEDYW J, PATTERSON J W, FREDENDALL L D. An overview of recent literature on spare parts inventories[J]. International Journal of Production Economics,2002, 76(2): 201-215.
|
[2] |
AHMAD R, KAMARUDDIN S. An overview of timebased and condition-based maintenance in industrial application [J]. Computers & Industrial Engineering,2012, 63(1): 135-149.
|
[3] |
MOON S, HICKS C, SIMPSON A. The development of a hierarchical forecasting method for predicting spare parts demand in the South Korean Navy—A case study [J]. International Journal of Production Economics,2012, 140(2): 794-802.
|
[4] |
FENG Y, YIN D, LUO B. Forecasting model for spare parts with intermittent demand based on SES [J].Ordnance Industry Automation, 2011, 30(2): 18-21 (in Chinese).
|
[5] |
SHERBROOKE C C. Vari-metric: Improved approximations for multi-indenture, multi-echelon avalibility models [J]. Operations Research, 2017, 34(2):311-319.
|
[6] |
MUCKSTADT J A. A model for a multi-item, multiechelon,multi-indenture inventory system [J]. Management Science, 1973, 20(4): 472-481.
|
[7] |
HILLESTAD R J. Dyna-METRIC: Dynamic multiechelon technique for recoverable item control [R]. US:RAND Corporation, 1982,
|
[8] |
GRAVES S C. A multi-echelon inventory model for a repairable item with one-for-one replenishment [J].Management Science, 1985, 31(10): 1247-1256.
|
[9] |
RUSTENBURG W D, HOUTUM G J, ZIJM W H M. Spare parts management at complex technologybased organizations: An agenda for research [J]. International Journal of Production Economics, 2001,71(1/2/3): 177-193.
|
[10] |
CAI Z M, JIN J S, CHEN Y Q. Warship formation spare parts allotment optimization method under multi-constraints [J]. Systems Engineering and Electronics,2015, 37(4): 838-844 (in Chinese).
|
[11] |
YU X. Application of OPUS 10 in formulation of ship’s initial spare parts list [J]. Equipment Manufacturing Technology, 2014, 12: 141-143 (in Chinese).
|
[12] |
WONG H, HOUTUM G J, CATTRYSSE D, et al.Multi-item spare parts systems with lateral transshipments and waiting time constraints [J]. European Journal of Operational Research, 2006, 171(3): 1071-1093.
|
[13] |
YI H. Research on ship’s general reliability model and reliability engineering methods [D]. Shanghai: Shanghai Jiao Tong University, 2003.
|
[14] |
YOON K B, SOHN S Y. Finding the optimal CSP inventory level for multi-echelon system in air force using random effects regression model [J]. European Journal of Operational Research, 2007, 180(3): 1076-1085.
|
[15] |
WANG H D, YI H, LIANG X F, et al. Analysis of the research status of ship spare parts allocation [J].Chinese Journal of Ship Research, 2016, 11(4):133-140(in Chinese).
|
[16] |
LIANG X F, YI H, ZHANG Y F, et al. Numerical simulation to reliability analysis of fault-tolerant repairable system [J]. Journal of Shanghai Jiao Tong University, 2010, 15(5): 526-534.
|
[17] |
BAO X, JI J H, LIAN H J. The ordering policy and model for critical spare part [J]. Journal of Shanghai Jiao Tong University, 2007, 41(7): 1097-1101 (in Chinese).
|
[18] |
YI H, YUAN Y. Numerical simulation based on the minim cut sets of faulty tree [J]. Journal of Shanghai Jiao Tong University, 1997, 31(9): 117-121 (in Chinese).
|
[19] |
LIANG X F, YI H, ZHANG Y F, et al. Reliability and safety analysis of an underwater dry maintenance cabin [J]. Ocean Engineering, 2010, 37(2/3): 268-276.
|
[20] |
BARABADY J, KUMAR U. Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran [J]. Reliability Engineering & System Safety, 2008, 93(4): 647-653.
|