[1] GAO W K, ZHANG Z S, JI H, et al. Optimal quasi-periodic preventive maintenance policies for a repairable system with stochastic maintenance interval [J]. Eksploatacja i Niezawodnosc-Maintenance and Reliability, 2015, 17(3): 389-397.
[2] KODO I, TOSHIO N. Optimal operation censoring policy of aircraft [C]//Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling.Nanjing, China: McGraw Hill, 2012: 184-191.
[3] JIA X, CHRISTER A H. A prototype cost model of functional check decisions in reliability-centered maintenance[J]. Journal of the Operational Research Society,2002, 53(12): 1380-1384.
[4] JIANG R. Optimization of alarm threshold and sequential inspection scheme [J]. Reliability Engineering & System Safety, 2010, 95(3): 208-215.
[5] JIANG R. An efficient quasi-periodic inspection scheme for a one-component system [J]. IMA Journal of Management Mathematics, 2017, 28(3): 373-386.
[6] GAO W K, ZHANG Z S, ZHOU Y F, et al. Maintenance optimization for a system with an implemented interval of replacement activities [C]//International Conference on Quality, Reliability, Risk, Maintenance,and Safety Engineering. Emeishan, China: IEEE,2013: 664-669.
[7] WU S M. Preventive maintenance models: A review[M]//TADJ L, OUALI M S, YACOUT S, et al.Replacement Models with Minimal Repair. London:Springer London, 2011: 129-140.
[8] CASTRO I T, SANJU′AN E L. An optimal maintenance policy for repairable systems with delayed repairs[J]. Operations Research Letters, 2008, 36(5):561-564.
[9] CHEN M. Optimal random replacement models with continuously processing jobs [J]. Applied Stochastic Models in Business and Industry, 2013, 29(2): 118-126.
[10] ZHAO X, QIAN C, NAKAGAWA T. Age replacement with overtime policy [C]//Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling. Nanjing, China: McGraw Hill, 2012: 661-668.
[11] LU Z Q, CUI W W, HAN X L. Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty [J]. Computers & Industrial Engineering, 2015, 80: 236-244.
[12] MALIK M A K. Reliable preventive maintenance scheduling [J]. AIIE Transactions, 1979, 11(3): 221-228.
[13] LI D W, ZHANG Z H, ZHONG Q H, et al. Performance deterioration modeling and optimal preventive maintenance strategy under scheduled servicing subject to mission time [J]. Chinese Journal of Aeronautics,2014, 27(4): 821-828.
[14] GUO J F, RUI Z Y, FENG R C, et al. Imperfect preventive maintenance for numerical control machine tools with log-linear virtual age process [J]. Journal of Central South University, 2014, 21(12): 4497-4502.
[15] NAKAGAWA T. Maintenance theory of reliability [M].London: Springer-Verlag, 2005.
[16] PAN E S, LIAO W Z, XI L F. Single-machine-based production scheduling model integrated preventive maintenance planning [J]. International Journal of Advanced Manufacturing Technology, 2010, 50(1/2/3/4):365-375.
[17] WANG W B. An overview of the recent advances in delay-time-based maintenance modeling [J]. Reliability Engineering & System Safety, 2012, 106: 165-178.
[18] JIA J S, WU S M. Optimizing replacement policy for a cold-standby system with waiting repair times [J].Applied Mathematics and Computation, 2009, 214(1):133-141.
[19] EL-SHERBENY M S. Stochastic behavior of a twounit cold standby redundant system under Poisson shocks [J]. Arabian Journal for Science and Engineering,2017, 42(7): 3043-3053.
[20] JIA X, CHEN H, CHENG Z J, et al. A comparison between two switching policies for two-unit standby system [J]. Reliability Engineering & System Safety,2016, 148: 109-118.
[21] ZHONG C Q, JIN H B. A novel optimal preventive maintenance policy for a cold standby system based on semi-Markov theory [J]. European Journal of Operational Research, 2014, 232(2): 405-411.
[22] ERYILMAZ S, TANK F. On reliability analysis of a two-dependent-unit series system with a standby unit [J]. Applied Mathematics and Computation, 2012,218(15): 7792-7797.
[23] SALARI N, MAKIS V. Optimal preventive and opportunistic maintenance policy for a two-unit system[J]. International Journal of Advanced Manufacturing Technology, 2017, 89(1/2/3/4): 665-673.
[24] LAI M T, YAN H. Optimal number of minimal repairs with cumulative repair cost limit for a two-unit system with failure rate interactions [J]. International Journal of Systems Science, 2016, 47(2): 466-473.
[25] MANATOS A, KOUTRAS V P, PLATIS A N. Dependability and performance stochastic modeling of a two-unit repairable production system with preventive maintenance [J]. International Journal of Production Research, 2016, 54(21): 6395-6415.
[26] GAO W K, ZHANG Z S, ZHOU Y F, et al. Optimal Quasi-periodic Preventive Maintenance Policies for a Two-unit Series System [J]. Journal of Southeast University(English Edition), 2013, 29(4): 450-455.
[27] XIAO L, SONG S L, CHEN X H, et al. Joint optimization of production scheduling and machine group preventive maintenance [J]. Reliability Engineering & System Safety, 2016, 146: 68-78.
[28] WANG S J, LIU M. Two-machine flow shop scheduling integrated with preventive maintenance planning [J].International Journal of Systems Science, 2016, 47(3):672-690.
[29] WANG Z, YANG J, WANG G, et al. Application of three-parameter Weibull mixture model for reliability assessment of NC machine tools: a case study [J]. Proceedings of the Institution of Mechanical Engineers,Part C: Journal of Mechanical Engineering Science,2011, 225(11): 2718-2726.
[30] SHEN G X, GU D W, ZHANG Y Z, et al. Optimal preventive maintenance interval period of CNC [J].Journal of Chongqing University, 2012. 35(1): 7-10(in Chinese).
|