[1] Neitzel R L, Seixas N S, Ren K K. A review of crane safety in the construction industry [J]. Applied Occupational and Environmental Hygiene, 2001,16(2): 1106-1117.[2] Yakubu O, Sun M. Cost and time control of construction projects in the UK [C]// Proceedings of 2007 International Conference on Construction and Real Estate Management. Bristol, England: [s.n.], 2007: 278-286.[3] Sun J, Zhang L, Huang J F, et al. Comparison of the role of supervising engineer in construction project contract conditions: An analysis in the field of process in payment of project funds [C]// Proceedings of 2nd International Conference on Engineering and Business Management. Wuhan, China: [s.n.], 2011: 1176-1180.[4] Khayyam H, Ranjbarzadeh H, Marano V. Intelligent control of vehicle to grid power [J]. Journal of Power Sources, 2012, 201: 1-9.[5] Foster I, Kesselman C. The grid: Blueprint for a new computing infrastructure [M]. San Mateo, CA:Morgan Kaufmann, 1999.[6] Butt A R, Adabala S, Kapadia N H, et al. Gridcomputing portals and security issues [J]. Journal of Parallel and Distributed Computing, 2003, 63(10):1006-1014.[7] Chervenak A, Foster I, Kesselman C, et al. The data grid: Towards an architecture for the distributed management and analysis of large scientific datasets [J]. Journal of Network and Computer Applications,2000, 23(3): 187-200.[8] Grimshaw A S, Humphrey M A, Natrajan A. A philosophical and technical comparison of Legion and Globus [J]. IBM Journal of Research and Development,2004, 48(2): 233-254.[9] Jagatheesan A. An introduction to data grid management systems [C]// Proceedings of 6th International Conference on Web Information Systems Engineering (WISE 2005). New York, NY, USA: WISE,2005: 764-764.[10] L¨u Zhi. The quality management of RID-Based information management system project [D]. Beijing,China: School of Economics and Management, Beijing University of Post and Telecommunication, 2010(in Chinese).[11] Chen Ping. Gridding urban management model [M].Beijing, China: Peking University Press, 2006 (in Chinese).[12] Xue X L, Li X D, Shen Q P, et al. An agent-based framework for supply chain coordination in construction[J]. Automation in Construction, 2005, 14 (3):413-430.[13] Busch T. Attitudes towards management by objects:An empirical investigation of self-efficacy and goal commitment [J]. Scandinavian Journal of Management,1998, 14(3): 289-299.[14] Andersen E S. Warning: Activity planning is hazardous to your project’s health! [J]. International Journal of Project Management, 1996, 14(2): 89-94.[15] Malinen H. Project management by results [J]. International Journal of Project Management, 1984, 14(4):207-210.[16] Girmscheid G. Construction production theory: Planning and control of the construction production process [J]. Bauingenieur, 2008, 83: 36-48.[17] Geekie A, Steyn H. Buffer sizing for the critical chain project management method [J]. South African Journal of Industrial Engineering, 2008, 19(1): 73-88.[18] Jagathipriya, Byali R P, Kannan M V. Critical chain project management: A new project management philosophy for multi project environment [J].Journal of Spacecraft Technology, 2008, 18(1): 30-36.[19] Tukel O I, Rom W O, Eksioglu S D. An investigation of buffer sizing techniques in critical chain scheduling [J]. European Journal of Operational Research,2006, 172(2): 401-416.[20] Trietsch D. The effect of systemic errors on optimal project buffers [J]. International Journal of Project Management, 2005, 23(4): 267-274.[21] Vanhoucke M. On the dynamic use of project performance and schedule risk information during project tracking [J]. Omega-International Journal of Management Science, 2011, 39(4): 416-426. |