Please wait a minute...
IMAGE/TABLE DETAILS
Joint Economic Optimization of AGV Logistics Scheduling and Orderly Charging in a Low-Carbon Automated Terminal
WANG Xuan, WANG Bao, CHEN Yanping, LIU Hong, MA Xiaohui
Journal of Shanghai Jiao Tong University    2024, 58 (9): 1370-1380.   DOI: 10.16183/j.cnki.jsjtu.2023.027
Abstract   (2058 HTML8 PDF(pc) (3702KB)(557)  

To improve the current automated guided vehicle (AGV) charging strategy at automated terminals, which is not fully coordinated with the distributed power supply, a joint optimization method of AGV logistics scheduling and orderly charging is proposed. First, the synergetic relationship between AGV logistics scheduling and charging scheduling is analyzed, and a joint optimization framework is built. Then, a method to calculate the distance traveled by AGVs while considering the segregation requirements of trucks inside and outside the terminal is proposed. Afterwards, for the AGV charging module, the judgment conditions of AGV charging status and the pile selection method are defined. Furthermore, to minimize the cost of purchasing electricity at the terminal, a joint optimization model of logistics scheduling and orderly charging is constructed by considering time-of-use tariff, distributed power feed-in tariff, power balance constraint, state of charge constraint at the termination moment, upper and lower bound constraints of decision variables, and logistics scheduling constraint. Finally, a fast solution method based on improved particle swarm optimization algorithm is proposed, of which the effectiveness and economic efficiency are verified by an actual case of a terminal.


船号 参数名称 坐标
1 岸桥1~8 (1, 562), (40, 562), (60, 562), (86, 562), (95, 562), (123, 562), (134, 562), (150, 562)
堆场1~8 (258, 108), (258, 216), (258, 350), (258, 108), (258, 226), (258, 330), (825, 216), (258, 400)
2 岸桥1~8 (400, 562), (435, 562), (455, 562), (475, 562), (500, 562), (525, 562), (545, 562), (555, 562)
堆场1~8 (360, 216), (270, 92), (324, 92), (375, 216), (450, 270), (554, 324), (639, 270), (580, 324)
3 岸桥1~8 (830, 562), (850, 562), (860, 562), (880, 562), (900, 562), (915, 562), (920, 562), (940, 562)
堆场1~8 (378, 92), (430, 92), (900, 400), (378, 92), (430, 92), (900, 400), (216, 79), (258, 405)
Tab.2 Coordinates of each quay crane and storage yardm
Extracts from the Article
各岸桥配数由当日作业量而定,满足并行同步作业的要求,各岸桥、堆场坐标如表2所示.
Other Images/Table from this Article