This paper proposes a Bayesian deep neural network-based cost risk assessment method for overhead transmission line projects in medium and heavy ice areas. First, the cost formation mechanism and the differentiated effects of key engineering attributes and external environmental factors on individual cost components are analyzed. A cost influencing factor set and a cost estimation model are established. Second, considering the nonlinear coupling among engineering attributes, environmental factors, and cost components, cost overrun risk is defined, and a Bayesian deep neural network-based joint prediction framework with multidimensional inputs and multiple cost-component outputs is developed to assess cost overrun probabilities. Finally, comparative analysis and cost overrun risk assessment are conducted using 976 actual project cost datasets from a central Chinese province. The results demonstrate the effectiveness of the proposed method in assessing the cost risks of overhead transmission line projects in medium and heavy ice areas.
CHEN Yidong, LI Jinming, HU Wei, TANG Jian, CHEN Ziyang, DENG Jiaxi, LI Shuaikang, ZHOU Bin
. Cost Risk Assessment Method for Overhead Transmission Line Project in Medium and Heavy Ice Areas[J]. Journal of Shanghai Jiaotong University, 0
: 1
.
DOI: 10.16183/j.cnki.jsjtu.2026.162