Journal of Shanghai Jiaotong University >
Application of Computer Controlled Hydraulic Synchronous Lifting Technology in Integral Salvage and Relocation Project of “Yangtze River Estuary II” Ancient Ship
Received date: 2023-07-01
Revised date: 2023-07-28
Accepted date: 2023-08-22
Online published: 2023-11-10
The synchronous lifting process is a key technology for non-destructive salvage and smooth transfer of ancient ships and their internal cultural relics to the predetermined dock. This paper, starting with the principle of computer controlled hydraulic synchronous lifting technology, and taking the actual underwater synchronous lifting project of Sewol in South Korea as an example, demonstrates the feasibility of the technology transfer to the underwater cultural relic salvage project. In addition, it elaborates on the planning of the elevator arrangement, control actions, and system requirements for the integral salvage and relocation project of the ancient ship. Moreover, it introduces the construction implementation details of synchronous lifting equipment. The hydraulic lift follows vertical layout, and the hardware assembly involves the installation of steel strands, bottom anchors and brackets, hydraulic cylinders, control systems, and underwater pins. The success of the integral salvage of “Yangtze River Estuary II” ancient ship has demonstrated the efficiency of the large-scale oil cylinder computer control system in improving the safety and integrity of the salvaged object in marine sunken ships, opening up a new implementation path for the integral salvage and relocation of related ancient ships in the future.
ZHOU Dongrong, JIANG Zhe, DAI Qing, ZHU Xiaodong, LIU Yu, ZHOU Yihe, WANG Lei . Application of Computer Controlled Hydraulic Synchronous Lifting Technology in Integral Salvage and Relocation Project of “Yangtze River Estuary II” Ancient Ship[J]. Journal of Shanghai Jiaotong University, 2023 , 57(S1) : 151 -158 . DOI: 10.16183/j.cnki.jsjtu.2023.S1.20
[1] | 颜维琦. 整体出水 “长江口二号”古船“重出江湖”[J]. 科学大观园, 2023, 657(1): 70-71. |
[1] | YAN Weiqi. The ancient ship “Yangtze River Estuary II” has returned to the world as a whole[J]. Science Park, 2023, 657(1): 70-71 |
[2] | 潘柳萍. 液压连续升降系统关键技术研究[D]. 上海: 同济大学, 2006. |
[2] | PAN Liuping. Research on key technologies of hydraulic continuous lifting system[D]. Shanghai: Tongji University, 2006. |
[3] | 乌建中. 上海东方明珠广播电视塔钢天线桅杆液压同步提升控制[J]. 液压气动与密封, 1996, 16(4): 4-8. |
[3] | WU Jianzhong. Hydraulic synchronous lifting control of steel antenna mast of the Oriental Pearl TV tower radio and TV tower[J]. Hydraulics Pnenmatics & Seals, 1996, 16(4): 4-8. |
[4] | 王伟平, 杨濛, 卞永明, 等. 沉船打捞带缓冲补偿的液压同步提升系统研究[J]. 中国工程机械学报, 2017, 15(5): 400-405. |
[4] | WANG Weiping, YANG Meng, BIAN Yongming, et al. Study of hydraulic synchronous lifting system for shipwreck salvage with cushion compensation[J]. Chinese Journal of Construction Machinery, 2017, 15(5): 400-405. |
[5] | 卞永明. 大型构件液压同步提升技术[M]. 上海: 上海科学技术出版社, 2015. |
[5] | BIAN Yongming. Hydraulic synchronous lifting technology for large components[M]. Shanghai: Shanghai Scientific & Technical Publishers, 2015. |
/
〈 |
|
〉 |