Field Test of Mechanical Properties of Large Diameter Concrete Jacking Pipe in Soft Soil

Expand
  • 1.Department of Civil Engineering, Shanghai Jiaotong University, Shanghai 200240, China
    2.Shanghai Municipal Sewerage Co. , Ltd. , Shanghai 200233, China

Received date: 2013-11-29

  Online published: 2014-11-28

Abstract

Annular reinforcing steel bar stress and pipe-soil contact pressure during pipe-jacking were monitored on the spot. The differences of the active contact pressure from the related research results were analyzed. The results show that when the pipe is pulled in the stable slurry interface which has been already formed, and since the test pipe was pulled into the tunnel bore, the distribution of contact pressure tends to be uniform and remain stable. But the contact pressure will increase suddenly when grouting, and return to normal gradually after stopping pulling. The lateral force of the pipe is also stable, though not big, mainly showing compressive stress, whose changing is controlled by pipeline axial deviation and grouting. Therefore, the pipe is in a state of eccentric compression in the test. Compared with the results of the field test, the specification is rather conservative. Besides, the active distribution of contact pressure is close to the load model developed by Lei Han, which can be used to optimize pipeline structure design.

Cite this article

LIU Xiang, BAI Hai-mei, CHEN Xiao-chen, CHEN Jin-jian, WANG Jian-hua . Field Test of Mechanical Properties of Large Diameter Concrete Jacking Pipe in Soft Soil[J]. Journal of Shanghai Jiaotong University, 2014 , 48(11) : 1503 -1509 . DOI: 10.16183/j.cnki.jsjtu.2014.11.001

References

[1] 王承德. 近十年来超长距离顶管发展概况[J]. 特种结构, 1997, 14(4): 16-21.
[1] WANG Cheng-de. Development of long distance pipe jacking in nearly a decade[J]. Special Structures, 1997, 14(4): 16-21.
[2] Milligan G W E, Norris P. Site based research in pipe jacking-objectives, procedures and a case history[J]. Tunnelling and Underground Space Technology, 1996, 11(1): 3-24.
[3] Milligan G W E, Norris P. Pipe-soil interaction during pipe jacking[J]. Geotechnical Engineering, 1999, 137(1): 27-44.
[4] 潘同燕. 大口径急曲线顶管施工力学分析与监测技术研究[D]. 上海: 同济大学, 2000.
[5] 魏纲, 徐日庆, 余剑英, 等. 顶管施工中管道受力性能的现场试验研究[J]. 岩土力学, 2005, 26(8): 1273-1277.
[5] WEI Gang, XU Ri-qing, YU Jian-ying, et al. Site-based experimental study on pipe behavior during pipe jacking[J]. Rock and Soil Mechanics, 2005, 26(8): 1273-1277.
[6] 王承德. 顶进管道受力分析[J]. 特种结构, 2006, 23(4): 87-89.
[6] WANG Cheng-de. Analysis of jacking pipe stress[J]. Special Structures, 2006, 23(4): 87-89.
[7] 黄吉龙, 陈锦剑, 王建华, 等. 大口径顶管顶进过程的数值模拟分析[J]. 地下空间与工程学报, 2008, 4(3): 489-493.
[7] HUANG Ji-long, CHEN Jin-jian, WANG Jian-hua, et al. Numerical analysis of large diameter Pipe-jacking[J]. Chinese Journal of Underground Space and Engineering, 2008, 4(3): 489-493.
[8] 雷晗. 大直径砼顶管工程中土与结构的相互作用分析[D]. 上海: 上海交通大学, 2012.
[9] CECS 246: 2008,给水排水工程顶管技术规程[S].
[10] ATV A-161. Structural calculation of drive pipes[S].
[11] ASCE 27-00. Standard practice for direct design of precast concrete pipe for jacking in trenchless construction[S].
[12] 雷晗, 陈锦剑, 王建华, 等. 大直径砼顶管的管道受力特性分析[J]. 上海交通大学学报, 2011, 45(10): 1493-1497.
[12] LEI Han, CHEN Jin-jian, WANG Jian-hua, et al. Analysis on performance of large diameter concrete jacking pipe[J]. Journal of Shanghai Jiaotong University, 2011, 45(10): 1493-1497.
Outlines

/