[1] |
KUMAR N, VIDYARTHI D P. A model for resource-constrained project scheduling using adaptive PSO[J]. Soft Computing, 2016, 20(4): 1565-1580.
|
[2] |
ELSAYED S, SARKER R, RAY T, et al. Consolidated optimization algorithm for resource-constrained project scheduling problems[J]. Information Sciences, 2017, 418/419: 346-362.
|
[3] |
LIU J, QIAO F, MA Y M, et al. Novel slack-based robust scheduling rule for a semiconductor manufacturing system with uncertain processing time[J]. Frontiers of Engineering Management, 2018, 5(4): 507-514.
|
[4] |
ELLOUMI S, FORTEMPS P, LOUKIL T. Multi-objective algorithms to multi-mode resource-constrained projects under mode change disruption[J]. Computers & Industrial Engineering, 2017, 106: 161-173.
|
[5] |
PAPROCKA I, SKOLUD B. A hybrid multi-objective immune algorithm for predictive and reactive scheduling[J]. Journal of Scheduling, 2017, 20(2): 165-182.
|
[6] |
VAN DE VONDER S, DEMEULEMEESTER E, HERROELEN W. Proactive heuristic procedures for robust project scheduling: An experimental analysis[J]. European Journal of Operational Research, 2008, 189(3): 723-733.
|
[7] |
VAN DE VONDER S, DEMEULEMEESTER E, HERROELEN W. A classification of predictive-reactive project scheduling procedures[J]. Journal of Scheduling, 2007, 10(3): 195-207.
|
[8] |
VARAKANTHAM P, FU N, LAU H C. A proactive sampling approach to project scheduling under uncertainty[C]∥30th AAAI Conference on Artificial Intelligence. Phoenix, Arizona, USA: AAAI, 2016: 3195-3201.
|
[9] |
张国辉,吴立辉,聂黎,等. 考虑机器故障的柔性作业车间鲁棒调度方法[J]. 系统仿真学报,2016, 28(4): 867-873.
|
|
ZHANG Guohui, WU Lihui, NIE Li, et al. Robust flexible job shop scheduling method with machine breakdowns[J]. Journal of System Simulation, 2016, 28(4): 867-873.
|
[10] |
WANG D J, LIU F, WANG Y Z, et al. A knowledge-based evolutionary proactive scheduling approach in the presence of machine breakdown and deterioration effect[J]. Knowledge-Based Systems, 2015, 90: 70-80.
|
[11] |
赵婵媛,陆志强,崔维伟. 考虑随机故障的流水线调度问题前摄优化方法[J]. 浙江大学学报(工学版), 2016, 50(4): 641-649.
|
|
ZHAO Chanyuan, LU Zhiqiang, CUI Weiwei. Proactive scheduling optimization on flow shops with random machine breakdowns[J]. Journal of Zhejiang University (Engineering Science), 2016, 50(4): 641-649.
|
[12] |
陆志强,张思源,崔维伟. 集成预防性维护和流水线调度的鲁棒性优化研究[J]. 自动化学报,2015, 41(5): 906-913.
|
|
LU Zhiqiang, ZHANG Siyuan, CUI Weiwei. Integrating production scheduling and maintenance policy for robustness in flow shop problems[J]. Acta Automatica Sinica, 2015, 41(5): 906-913.
|
[13] |
PAN W T. A new Fruit Fly Optimization Algorithm: Taking the financial distress model as an example[J]. Knowledge-Based Systems, 2012, 26(26): 69-74.
|
[14] |
LAMBRECHTS O, DEMEULEMEESTER E, HERROELEN W. A tabu search procedure for developing robust predictive project schedules[J]. International Journal of Production Economics, 2008, 111(2): 493-508.
|
[15] |
RANJBAR M, KIANFAR F, SHADROKH S. Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm[J]. Applied Mathematics & Computation, 2008, 196(2): 879-888.
|
[16] |
LAMBRECHTS O, DEMEULEMEESTER E, HERROELEN W. Time slack-based techniques for robust project scheduling subject to resource uncertainty[J]. Annals of Operations Research, 2011, 186(1): 443-464.
|
[17] |
孙虎,周晶燕. 装配作业车间调度的免疫粒子群算法实现[J]. 武汉理工大学学报(信息与管理工程版), 2019, 41(3): 282-286.
|
|
SUN Hu, ZHOU Jingyan. Implementation of immune particle swarm optimization algorithm for assembly job shop scheduling[J]. Journal of Wuhan University of Technology (Information & Management Engineering), 2019, 41(3): 282-286.
|