[1]YI J, DING S, SONG D, et al. Steadystate throughput and scheduling analysis of multicluster tools: A decomposition approach[J]. IEEE Transactions on Automation Science & Engineering, 2008, 5(2): 321336.
[2]SETHI S P, SIDNEY J, SRISKANDARAJAH C. Scheduling in dual gripper robotic cells for productivity gains[J]. IEEE Transactions on Robotics and Automation, 2015, 17(3): 324341.
[3]DROBOUCHEVITCH I G, GEISMAR H N, SRISKANDARAJAH C. Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models[J]. European Journal of Operational Research, 2010, 206(3): 623633.
[4]GEISMAR H N, DAWANDE M, SRISKARAJAH C. Robotic cells with parallel machines: Throughput maximization in constant traveltime cells[J]. Journal of Scheduling, 2004, 7(5): 375395.
[5]GEISMAR H N, SRISKARAJAH C, RAMANAN N. Increasing throughput for robotic cells with parallel machines and multiple robots[J]. IEEE Transactions on Automation Science and Engineering, 2004, 1(1): 8489.
[6]SOLIMANPUR M, ELMI A. A tabu search approach for cell scheduling problem with makespan criterion[J]. International Journal of Production Economics, 2013, 141(2): 639645.
[7]ZHOU Z, CHE A D, YAN P Y. A mixed integer programming approach for multicyclic robotic flowshop scheduling with time window constraints[J]. Applied Mathematical Modeling, 2012, 36(8): 36213629.
[8]SHAPIRO G W, NUTTLE H L W. Hoist scheduling for a PCB electroplating facility[J]. IIE Transactions, 1988, 20(2): 157167.
[9]FOUMANI M, GUNAWAN I, SMITHMILES K, et al. Notes on feasibility and optimality conditions of smallscale multifunction robotic cell scheduling problems with pickup restrictions [J]. IEEE Transactions on Industrial Informatics, 2015, 11(3): 821829.
[10]LEI L, LIU Q. Optimal cyclic scheduling of a robotic processing line with twoproduct and timewindow constraints[J]. INFOR: Information Systems and Operational Research, 2001, 39(2): 185199.
[11]ZHANG J, FANG X, QI L. LCM cycle based optimal scheduling in robotic cell with parallel workstations[C]∥IEEE International Conference on Robotics and Automation. IEEE, 2014: 13671373.
[12]PERKINSON T L, MCLARTY P K, GYURCSIK R S, et al. Singlewafer cluster tool performance: An analysis of throughput[J]. IEEE Transactions on Semiconductor Manufacturing, 1994, 7(3): 369373. |