Journal of Shanghai Jiaotong University ›› 2013, Vol. 47 ›› Issue (08): 1227-1233.
• Automation Technique, Computer Technology • Previous Articles Next Articles
Received:
2012-11-28
Online:
2013-08-29
Published:
2013-08-29
CLC Number:
GAO Zhongshun,ZHOU Binghai. Disjunctive Graph-based Modeling and Scheduling for Cluster Tools[J]. Journal of Shanghai Jiaotong University, 2013, 47(08): 1227-1233.
[1]Geismar N, Dawande M, Sriskandarajah C. Productivity improvement from using machine buffers in dualgripper cluster tools [J]. IEEE Transactions on Automation Science and Engineering, 2011, 8(1): 2941. [2]Rostami S, Hamidzadeh B. An optimal residencyaware scheduling technique for cluster tools with buffer module [J]. IEEE Transactions on Semiconductor Manufacturing, 2004, 17(1): 6873. [3]Perkinson T L, McLarty P K, Gyurcsik S R, et al. Singlewafer cluster tool performance: An analysis of throughput [J]. IEEE Ttansactions on Semiconductor Manufacture, 1994, 7(3): 369373. [4]Venkatesh S, Davenport R, Foxhoven P, et al. A steadystate throughput analysis of cluster tools: dualblade versus singleblade robots [J]. IEEE Transactions on Semiconductor Manufacturing, 1997, 10(4): 418424. [5]Herrmann J W, Chandrasekaran N, Conaghan B F, et al. Evaluating the impact of process changes on cluster tool performance [J]. IEEE Transactions on Semiconductor Manufacturing, 2000, 13(2): 181192. [6]Kim J H, Lee T E, Lee H Y, et al. Scheduling analysis of timeconstrained dualarmed cluster tools [J]. IEEE Transactions on Semiconductor Manufacturing, 2003, 16(3): 512534. [7]Rostami S, Hamidzadeh B. Optimal scheduling techniques for cluster tools with processmodule and transportmodule residency constraints [J]. IEEE Transactions on Semiconductor Manufacturing, 2002, 15(3): 341349. [8]Shadi R, Babak H, Dan C. An optimal periodic scheduler for dualarm robots in cluster tools with residency constraints [J]. IEEE Transactions on Robotics and Automation, 2001, 17(5): 609618. [9]李鑫, 周炳海, 陆志强. 基于事件驱动的集束型晶圆制造设备调度算法[J]. 上海交通大学学报,2009,43(6): 898901. LI Xin, ZHOU Binghai, LU Zhiqiang. Scheduling algorithm for cluster tools of wafer fabrications based on eventsdriven [J]. Journal of Shanghai Jiaotong University, 2009, 43(6): 898901. [10]Lee T E. A review of scheduling theory and methods for semiconductor manufacturing cluster tools [C]∥Proceedings of the 2008 Winter Simulation Conference. Austin, TX: IEEE, 2008: 21272135. [11]Ding S, Yi J, Zhang M T. Multicluster tools scheduling: an integrated event graph and network model approach [J]. IEEE Transactions on Semiconductor Manufacturing, 2006, 19(3): 339351. [12]刘明祥, 周炳海. 基于时间约束集的集束型设备群调度方法[J]. 自动化学报, 2012, 38(3): 479485. LIU Mingxiang, ZHOU Binghai. Scheduling algorithm of multicluster tools based on time constraint sets [J]. Acta Automatica Sinica, 2012, 38(3): 479485. [13]Carlier J, Haouari M, Kharbeche M, et al. An optimizationbased heuristic for the robotic cell problem [J]. European Journal of Operation Research, 2010, 202: 636645. [14]Drobouchevitch I G, Sethi S P, Sriskandarajah C. Scheduling dual gripper robotic cell: Oneunit cycles [J]. European Journal of Operational Research, 2006, 171: 598631. [15]Sriskandarajah C, Sethi S P, Drobouchevitch I G. Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models [J]. European Journal of Operational Research, 2010, 206: 623633. |
[1] | LIU Yahui, SHEN Xingwang, GU Xinghai, PENG Tao, BAO Jinsong, ZHANG Dan. A Dual-System Reinforcement Learning Method for Flexible Job Shop Dynamic Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(9): 1262-1275. |
[2] | LI Dechang, YANG Hualong, DUAN Jingru. A Joint Optimization of Vessel Scheduling and Refueling Strategy for Container Liner Shipping with Cooperative Agreements [J]. Journal of Shanghai Jiao Tong University, 2022, 56(7): 953-964. |
[3] | LI Linyan, HAN Shuang, QIAO Yanhui, LI Li, LIU Yongqian, YAN Jie, LIU Haidong. A Wind-Solar-Electric Vehicles Coordination Scheduling Method for High Proportion New Energy Grid-Connected Scenarios [J]. Journal of Shanghai Jiao Tong University, 2022, 56(5): 554-563. |
[4] | TANG Hongtao, WANG Dannan, SHAO Yiping, ZHAO Wenbin, JIANG Weiguang, CHEN Qingfeng. A Modified Migrating Birds Optimization for Multi-Objective Lot Streaming Hybrid Flowshop Scheduling [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 201-213. |
[5] | WANG Zixiang, WU Zerui, LIU Ran. Weekly Physician Scheduling for Emergency Departments with Time-Varying Demands of Patients with Revisits [J]. Journal of Shanghai Jiao Tong University, 2022, 56(2): 242-252. |
[6] | LU Qiuyu, YU Zhen, YANG Yinguo, LI Li. Two-Stage Optimal Schedule of Offshore Wind-Power-Integrated Multi-Microgrid Considering Uncertain Power of Sources and Loads [J]. Journal of Shanghai Jiao Tong University, 2022, 56(10): 1308-1316. |
[7] | WANG Jinfeng, CHEN Lu, YANG Wenhui. A Single Machine Scheduling Problem Considering Machine Availability Constraints [J]. Journal of Shanghai Jiao Tong University, 2021, 55(1): 103-110. |
[8] | JIANG Xiaokang, ZHANG Peng, LÜ Youlong, ZHAO Xinming, ZHANG Jie. Hybrid Ant Colony Algorithm for Batch Scheduling in Semiconductor Furnace Operation [J]. Journal of Shanghai Jiaotong University, 2020, 54(8): 792-804. |
[9] | ZHU Hongwei, LU Zhiqiang. Modeling and Optimization of Resource Constrained Project Scheduling Problem Considering Employee-Timetabling [J]. Journal of Shanghai Jiaotong University, 2020, 54(6): 624-635. |
[10] | MENG Lingtong, JIANG Zuhua, TAO Ningrong, LIU Jianfeng, ZHENG Hong. Multi-Stockyard Scheduling Considering Technological Process and Combined Assembly Block [J]. Journal of Shanghai Jiao Tong University, 2020, 54(4): 331-343. |
[11] | MA Changpu,ZHOU Binghai. Scheduling of Multi-Load Rail Guided Vehicles in AS/RS with Collision Avoidance Constrains [J]. Journal of Shanghai Jiaotong University, 2020, 54(2): 126-134. |
[12] | FANG Jia, LU Zhiqiang. Modeling and Optimization of Robust Scheduling Template Considering Equipment Failure [J]. Journal of Shanghai Jiao Tong University, 2020, 54(12): 1278-1290. |
[13] | ZHAO Rui, GU Xingsheng. A Discrete Sine Optimization Algorithm for No-Idle Flow-Shop Scheduling Problem [J]. Journal of Shanghai Jiao Tong University, 2020, 54(12): 1291-1299. |
[14] | CUI Weiwei (崔维伟). Approximate Approach to Deal with the Uncertainty in Integrated Production Scheduling and Maintenance Planning [J]. Journal of Shanghai Jiao Tong University (Science), 2020, 25(1): 106-117. |
[15] | MENG Lingtong,JIANG Zuhua,TAO Ningrong,LIU Jianfeng,LI Baihe. Combined Assembly Block Scheduling in Storage Yard of Shipbuilding [J]. Journal of Shanghai Jiaotong University, 2019, 53(7): 780-788. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||