Journal of Shanghai Jiaotong University ›› 2013, Vol. 47 ›› Issue (08): 1227-1233.
• Automation Technique, Computer Technology • Previous Articles Next Articles
Received:2012-11-28
Online:2013-08-29
Published:2013-08-29
CLC Number:
GAO Zhongshun,ZHOU Binghai. Disjunctive Graph-based Modeling and Scheduling for Cluster Tools[J]. Journal of Shanghai Jiaotong University, 2013, 47(08): 1227-1233.
| [1]Geismar N, Dawande M, Sriskandarajah C. Productivity improvement from using machine buffers in dualgripper cluster tools [J]. IEEE Transactions on Automation Science and Engineering, 2011, 8(1): 2941. [2]Rostami S, Hamidzadeh B. An optimal residencyaware scheduling technique for cluster tools with buffer module [J]. IEEE Transactions on Semiconductor Manufacturing, 2004, 17(1): 6873. [3]Perkinson T L, McLarty P K, Gyurcsik S R, et al. Singlewafer cluster tool performance: An analysis of throughput [J]. IEEE Ttansactions on Semiconductor Manufacture, 1994, 7(3): 369373. [4]Venkatesh S, Davenport R, Foxhoven P, et al. A steadystate throughput analysis of cluster tools: dualblade versus singleblade robots [J]. IEEE Transactions on Semiconductor Manufacturing, 1997, 10(4): 418424. [5]Herrmann J W, Chandrasekaran N, Conaghan B F, et al. Evaluating the impact of process changes on cluster tool performance [J]. IEEE Transactions on Semiconductor Manufacturing, 2000, 13(2): 181192. [6]Kim J H, Lee T E, Lee H Y, et al. Scheduling analysis of timeconstrained dualarmed cluster tools [J]. IEEE Transactions on Semiconductor Manufacturing, 2003, 16(3): 512534. [7]Rostami S, Hamidzadeh B. Optimal scheduling techniques for cluster tools with processmodule and transportmodule residency constraints [J]. IEEE Transactions on Semiconductor Manufacturing, 2002, 15(3): 341349. [8]Shadi R, Babak H, Dan C. An optimal periodic scheduler for dualarm robots in cluster tools with residency constraints [J]. IEEE Transactions on Robotics and Automation, 2001, 17(5): 609618. [9]李鑫, 周炳海, 陆志强. 基于事件驱动的集束型晶圆制造设备调度算法[J]. 上海交通大学学报,2009,43(6): 898901. LI Xin, ZHOU Binghai, LU Zhiqiang. Scheduling algorithm for cluster tools of wafer fabrications based on eventsdriven [J]. Journal of Shanghai Jiaotong University, 2009, 43(6): 898901. [10]Lee T E. A review of scheduling theory and methods for semiconductor manufacturing cluster tools [C]∥Proceedings of the 2008 Winter Simulation Conference. Austin, TX: IEEE, 2008: 21272135. [11]Ding S, Yi J, Zhang M T. Multicluster tools scheduling: an integrated event graph and network model approach [J]. IEEE Transactions on Semiconductor Manufacturing, 2006, 19(3): 339351. [12]刘明祥, 周炳海. 基于时间约束集的集束型设备群调度方法[J]. 自动化学报, 2012, 38(3): 479485. LIU Mingxiang, ZHOU Binghai. Scheduling algorithm of multicluster tools based on time constraint sets [J]. Acta Automatica Sinica, 2012, 38(3): 479485. [13]Carlier J, Haouari M, Kharbeche M, et al. An optimizationbased heuristic for the robotic cell problem [J]. European Journal of Operation Research, 2010, 202: 636645. [14]Drobouchevitch I G, Sethi S P, Sriskandarajah C. Scheduling dual gripper robotic cell: Oneunit cycles [J]. European Journal of Operational Research, 2006, 171: 598631. [15]Sriskandarajah C, Sethi S P, Drobouchevitch I G. Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models [J]. European Journal of Operational Research, 2010, 206: 623633. |
| [1] | YANG Yinguo, FENG Yinying, WEI Wei, XIE Pingping, CHEN Yue. Coordinated Day-Ahead Scheduling and Real-Time Dispatch of a Wind-Thermal-Storage Energy Base Considering Flexibility Interval [J]. Journal of Shanghai Jiao Tong University, 2025, 59(9): 1270-1280. |
| [2] | ZHONG Ming, WU Ying, WU Chunli, WANG Fang. Tugboat Scheduling Problem Considering Time Windows and Flexible Returning Way to Base [J]. J Shanghai Jiaotong Univ Sci, 2025, 30(6): 1276-1288. |
| [3] | CHEN Shi, YANG Linsen, LIU Yihong, LUO Huan, ZANG Tianlei, ZHOU Buxiang. Optimal Scheduling Strategy of Newly-Built Microgrid in Small Sample Data-Driven Mode [J]. Journal of Shanghai Jiao Tong University, 2025, 59(6): 732-745. |
| [4] | ZHANG Li, WANG Bao, JIA Jianxiong, SONG Zhumeng, YE Yutong, YU Yue, LIN Jiaqing, XU Xiaoyuan. End-to-End Collaborative Optimization Method for Microgrid Power Prediction and Optimal Scheduling [J]. Journal of Shanghai Jiao Tong University, 2025, 59(6): 720-731. |
| [5] | QIU Zizhang, WANG Dawang, LU Zhifeng, WU Guohua. An Illuminator Resource Scheduling Methods Based on Tabu Search [J]. Air & Space Defense, 2025, 8(3): 132-140. |
| [6] | ZHAO Yingying, QIU Yue, ZHU Tianchen, LI Fan, SU Yun, TAI Zhenying, SUN Qingyun, FAN Hang. Online Steady-State Scheduling of New Power Systems Based on Hierarchical Reinforcement Learning [J]. Journal of Shanghai Jiao Tong University, 2025, 59(3): 400-412. |
| [7] | HU Kaiqiang, CAI Zexiang, CAI Yu, QU Jing, LIU Yuanyuan. Micro-Service Scheduling Model and Optimization for Protection and Control of Distribution Network Considering Virtualization Delay [J]. Journal of Shanghai Jiao Tong University, 2025, 59(11): 1684-1693. |
| [8] | ZHANG Jianhua, YAO Yi, ZHAO Si, WANG Yongyue. A Coordinated Control Scheme for Fast Frequency Regulation of Thermal Power Units Based on Flexibility Transformation [J]. Journal of Shanghai Jiao Tong University, 2025, 59(11): 1694-1706. |
| [9] | WANG Xuan, WANG Bao, CHEN Yanping, LIU Hong, MA Xiaohui. Joint Economic Optimization of AGV Logistics Scheduling and Orderly Charging in a Low-Carbon Automated Terminal [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1370-1380. |
| [10] | ZHOU Siyi, YANG Huanhong, HUANG Wentao, ZHOU Ze, JIAO Wei, YANG Zhenyu. Two-Stage Day-Ahead and Intra-Day Rolling Optimization Scheduling of Container Integrated Port Energy System [J]. Journal of Shanghai Jiao Tong University, 2024, 58(9): 1357-1369. |
| [11] | JIANG Zuhua1∗(蒋祖华), ZHOU Hongming2(周宏明), TAO Ningrong3(陶宁蓉), LI Baihe1(李柏鹤). Knowledge-Based Curved Block Construction Scheduling and Application in Shipbuilding [J]. J Shanghai Jiaotong Univ Sci, 2024, 29(5): 759-765. |
| [12] | CHEN Yini(陈旖旎), JIANG Zuhua* (蒋祖华). Multi-AGVs Scheduling with Vehicle Conflict Consideration in Ship Outfitting Items Warehouse [J]. J Shanghai Jiaotong Univ Sci, 2024, 29(3): 492-508. |
| [13] | GU Huijie, ZHOU Huafeng, PENG Chaoyi, HU Yaping, ZHAO Xinyi, XIE Jun, SHI Xionghua. A Multi-Time Scale Scheduling Model for Power Generation Systems with a High Proportion of New Energy Including Pumped Storage Power Stations [J]. Journal of Shanghai Jiao Tong University, 2024, 58(12): 1957-1967. |
| [14] | YE Zhiliang, LI Canbing, ZHANG Yongjun, LI Licheng, XIAO Yinjing, WU Yuhang, TAI Nengling. Optimization of Day-Ahead Dispatch Time Resolution in Power System with a High Proportion of Climate-Sensitive Renewable Energy Sources [J]. Journal of Shanghai Jiao Tong University, 2023, 57(7): 781-790. |
| [15] | LI Junshuang, HU Yan, TAI Nengling. Collaborative Optimization Scheduling of 5G Base Station Energy Storage and Distribution Network Considering Communication Load and Power Supply Reliability [J]. Journal of Shanghai Jiao Tong University, 2023, 57(7): 791-802. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||