Journal of Shanghai Jiaotong University ›› 2012, Vol. 46 ›› Issue (10): 1622-1626.
• Metallography and Metallurgical Technology • Previous Articles Next Articles
WANG Zhi-Ming-1, YANG Jian-Guo-2
Received:2012-02-24
Online:2012-10-30
Published:2012-10-30
CLC Number:
WANG Zhi-Ming-1, YANG Jian-Guo-2. Bounded Intensity Process and Its Applications in Reliability Assessment of NC Machine Tools[J]. Journal of Shanghai Jiaotong University, 2012, 46(10): 1622-1626.
| [1]Marshall S E, Chukova S. On analysing warranty data from repairable items[J]. Quality and Reliability Engineering International, 2010, 26(1): 4352.[2]敖长林, 李一军, 闫相斌, 等. 基于非齐次泊松过程的拖拉机发动机使用可靠性[J]. 机械工程学报, 2007, 43(10): 206210.AO Changlin, LI Yijun, YAN Xiangbin, et al. Operational reliability of tractor engines based on nonhomogeneous Poisson process[J]. Chinese Journal of Mechanical Engineering, 2007, 43(10): 206210.[3]TAN Furong, JIANG Zhibin, BAI Tongshuo. Reliability analysis of repairable systems using stochastic point processes [J]. Journal of Shanghai Jiaotong University, 2008, 13(3): 366369.[4]王智明, 杨建国, 王国强, 等. 多台数控机床最小维修的可靠性评估[J]. 哈尔滨工业大学学报, 2011, 43(7): 127130.WANG Zhiming, YANG Jianguo, WANG Guoqiang, et al. Reliability assessment of multiple NC machine tools with minimal repair [J]. Journal of Harbin Institute of Technology, 2011, 43(7): 127130.[5]Pulcini G. A bounded intensity process for the reliability of repairable equipment [J]. Journal of Quality Technology, 2001, 33(4): 480492.[6]Louit D M, Pascual R, Jardine A K S. A practical procedure for the selection of timetofailure models based on the assessment of trends in maintenance data[J]. Reliability Engineering and System Safety, 2009, 94(10): 16181628.[7]Viertava J, Vaurio J K. Testing statistical significance of trends in learning, ageing and safety indicators[J]. Reliability Engineering and System Safety, 2009, 94(6):11281132.[8]Meeker W Q, Escobar L A. Statistical methods for reliability data[M]. New York: John Wiley & Sons, 1998.[9]Nelson W. Accelerated testing: Statistical methods, test plans, and data analysis [M]. New York: John Wiley & Sons, 1990.[10]张英芝, 申桂香, 薛玉霞, 等. 随机截尾数控机床故障过程[J]. 吉林大学学报: 工学版, 2007, 37(6): 13461348.ZHANG Yingzhi, SHEN Guixiang, XUE Yuxia, et al. Failure process for numerical control machine with random ending method [J]. Journal of Jilin University: Engineering and Technology Edition, 2007, 37(6): 13461348. |
| [1] | FENG Pengfei, ZHOU Mi, LI Zhixuan, ZHU Guoqiang. Probability Statistical Model for Measured Ground Motion Based on Generalized Extreme Value Distribution [J]. Journal of Shanghai Jiao Tong University, 2025, 59(8): 1133-1144. |
| [2] | HU Xinming,WANG Deyu. Optimization of Ship Structures Using Ensemble of Surrogates with Recursive Arithmetic Average and Sequential Optimization and Reliability Assessment [J]. Journal of Shanghai Jiao Tong University, 2017, 51(2): 150-. |
| [3] | Gu Y.; Chen J.; Cheng Z.; Hu K.. Reliability analysis of multi-state repairable system with dynamic transition probabilities [J]. J Shanghai Jiaotong Univ Sci, 2016, 21(5): 615-620. |
| [4] | Liu Z.; Li Y.; Huang H.. Imprecise reliability assessment for heavy numerical control machine tools against small sample size problem [J]. J Shanghai Jiaotong Univ Sci, 2016, 21(5): 605-610. |
| [5] | Huang J.; Kong D.; Cui L.. Bayesian reliability assessment and degradation modeling with calibrations and random failure threshold [J]. J Shanghai Jiaotong Univ Sci, 2016, 21(4): 478-483. |
| [6] | WANG Wen-guang (王文光), DU Shi-jia* (杜时佳), CUI Li-rong (崔利荣). Multi-Point and Multi-Interval Availabilities for Markov Repairable Systems with History-Dependent Up and Down States [J]. Journal of shanghai Jiaotong University (Science), 2015, 20(3): 349-352. |
| [7] | REN Lina,RUI Zhiyuan,LIU Jun,LEI Chunli. Whole Lifecycle Reliability Assessment of Multiple NC Machine Tools with Minimal Repair [J]. Journal of Shanghai Jiaotong University, 2015, 49(01): 19-23. |
| [8] | FANG Pengya,CHANG Xinlong,HU Kuan,ZHANG Xiaojun. Optimization of Multidisciplinary Reliability Design Based on Interval Uncertainty [J]. Journal of Shanghai Jiaotong University, 2014, 48(10): 1451-1456. |
| [9] | WANG Zhiming1,YANG Jianguo2. Aperiodic Imperfect Preventive Maintenance Method of Bounded Intensity Process for Numerical Control Machine Tools [J]. Journal of Shanghai Jiaotong University, 2013, 47(11): 1661-1665. |
| [10] | WEN Qing-Guo, SONG Bao-Wei, WANG Peng, WANG Si-Ling. An Improved Kriging Approximation and Its Application to Shape Design Optimization of Torpedo [J]. Journal of Shanghai Jiaotong University, 2013, 47(04): 613-618. |
| [11] | 张毅,杨建国. Grey Neural Network Modeling for Machine Tool Thermal Error [J]. Journal of Shanghai Jiaotong University, 2011, 45(11): 1581-1586. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||