Journal of Shanghai Jiaotong University ›› 2012, Vol. 46 ›› Issue (09): 1431-1435.
• Automation Technique, Computer Technology • Previous Articles Next Articles
HU Da-Yong, YAO Zhen-Qiang
Received:2011-10-24
Online:2012-09-28
Published:2012-09-28
CLC Number:
HU Da-Yong, YAO Zhen-Qiang. Optimization Strategy for Bulk Ship Unloader Scheduling with Rail Routing Constraints[J]. Journal of Shanghai Jiaotong University, 2012, 46(09): 1431-1435.
| [1]Zhu Y, Lim A. Crane scheduling with noncrossing constraint [J]. Journal of the Operational Research Society, 2006, 57(12): 14641471.[2]Lee D H, Wang H Q, Miao L X. Quay crane scheduling with noninterference constraints in port container terminals [J]. Transportation Research Part E: Logistics and Transportation Review, 2008, 44(1): 124135.[3]Bierwirth C, Meisel F. A survey of berth allocation and quay crane scheduling problems in container terminals [J]. European Journal of Operational Research, 2010, 202(3): 615627.[4]Moccia L, Cordeau J F, Gaudioso M, et al. A branchandcut algorithm for the quay crane scheduling problem in a container terminal [J]. Naval Research Logistics, 2006, 53(1): 4559.[5]Sammarra M, Cordeau J F, Laporte G, et al. A tabu search heuristic for the quay crane scheduling problem [J]. Journal of Scheduling, 2007, 10(45): 327336.[6]Ng W C, Mak K L. Quay crane scheduling in container terminals [J]. Engineering Optimization, 2006, 38 (6): 723737.[7]Bierwirth C, Meisel F. A fast heuristic for quay crane scheduling with interference constraints [J]. Journal of Scheduling, 2009, 12(4): 345360.[8]Yalaoui F, Chu C. An efficient heuristic approach for parallel machine scheduling with job splitting and sequencedependent setup times [J]. IIE Transactions, 2003, 35(2): 183190.[9]胡大勇, 姚振强. 调整时间与顺序相关的等同并行机调度[J]. 机械工程学报, 2011, 47(16): 160165.HU Dayong, YAO Zhenqiang. Identical parallel machines scheduling with sequencedependent setup times [J]. Chinese Journal of Mechanical Engineering, 2011, 47(16): 160165.[10]Anghinolfi D, Paolucci M. Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach [J]. Computers and Operations Research, 2007, 34(11): 34713490. |
| [1] | ZHANG Rongfu, WANG Jinqiang, LIU Minxia. Optimal Design Method of Complex System Based on Resource Optimization [J]. Air & Space Defense, 2025, 8(3): 86-94. |
| [2] | HE Qinglin, ZHAO Hongyu, CHEN Yuxuan, HOU Xianghao. Design of Distributed Underwater Acoustic Tracking Algorithm for Aerial Targets Based on CRLB [J]. Air & Space Defense, 2025, 8(1): 86-94. |
| [3] | FAN Houming,XU Zhenlin,LI Yang,LIU Wenqi,GENG Jing. Hybrid Genetic Algorithm for Solving Multi-Depot Joint Distribution Routing Problem [J]. Journal of Shanghai Jiaotong University, 2019, 53(8): 1000-1009. |
| [4] | HUANG Qiang1,2 (黄 强), LOU Xin-yuan3 (楼新远), WANG Wei4* (王 薇), NI Shao-quan1 (倪少权). Research of Order Allocation Model Based on Cloud and Hybrid Genetic Algorithm Under Ecommerce Environment [J]. Journal of shanghai Jiaotong University (Science), 2013, 18(3): 334-342. |
| [5] | LIU Tian-Tang, JIANG Zhi-Bin, HU Hong-Tao, LIU Ran. An Enhanced Hybrid Genetic Algorithm for the Capacitated Arc Routing Problem [J]. Journal of Shanghai Jiaotong University, 2013, 47(04): 619-625. |
| [6] | YANG Hong-jie, GE Xiu-run, WANG Jian-hua, FU De-ming. Application of SQP Algorithm in 3D Lower Sequential Quadratic Programming Limit Analysis [J]. Journal of Shanghai Jiao Tong University, 2004, 38(06): 992-995. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||