[1]顾永宁, 胡志强, 谢彬, 等. 大型起重船波浪诱导吊索附加动力荷载研究[J]. 中国海上油气, 2005, 17 (3): 197202.GU Yongning, HU Zhiqiang, XIE Bin, et al. Study on the additional dynamic load of lifting rope due to wave induced motion of heavy crane barge [J]. China Offshore Oil and Gas, 2005, 17(3): 197202.[2]Neupert J, Mahl T, Sawodny O, et al. A nonlinear control strategy for boom cranes in radial direction [C] //Proceedings of the 2007 American Control Conference. New York: IEEE, 2007: 2530.[3]Ju F, Choo Y S, Cui F S. Dynamic response of tower crane induced by the pendulum motion of the payload [J]. International Journal of Solids and Structures, 2006, 43(2): 376389.[4]任会礼, 王学林, 胡于进, 等. 起重船吊物系统动力响应仿真分析[J]. 系统仿真学报, 2007, 19(12): 26652668.REN Huili, WANG Xuelin, HU Yujin, et al. Dynamic response simulation of lifting load system of ship mounted cranes [J]. Journal of System Simulation, 2007, 19(12): 26652668.[5]Todd M D, Vohra S T, Leban F. Dynamical measurements of ship crane load pendulation [C]// Oceans97 MTS/ IEEE Conference Proceedings. Halifax, Canada: IEEE, 1997: 12301236.[6]Yazid E, Parman S, Fuad K. Vibration analysis of flexible gantry crane system subjected swinging motion of payload [J]. Journal of Applied Sciences, 2011, 11(10): 17071715.[7]王立权, 许元革, 梁凌云, 等. 深水铺管起重船海上起重作业实时仿真[J]. 南京理工大学学报, 2012, 36(2): 364368.WANG Liquan, XU Yuange, LIANG Lingyun, et al. realtime simulation of offshore lifting operation of deepwater pipelay crane vessel [J]. Journal of Nanjing University of Science and Technology, 2012, 36(2): 364368.[8]库尔森C A, 杰费里A. 波[M]. 杨善元, 杨燕译. 北京: 地震出版社,1988.[9]孙志忠. 偏微分方程数值解法[M]. 北京: 科学出版社, 2005.[10]顾海军. 深水铺管起重船总体设计[J]. 船舶设计通讯, 2009(S1): 1322.GU Haijun. General design of deepwater pipelay crane vessel [J]. Journal of Ship Design, 2009(S1): 1322. |