L Wentian, WANG Yonghe. Dynamic stress analysis of subgradebridge transitionsection of qinshen railway [J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(3): 501504.
MA Weibin, HAN Zili. Study on adaptability of the existing subgrade to train speedincrease[J]. China Academy of Railway Sciences, 2008, 114(3): 14.
[3]Sunaga M. Vibration behavior of road bed on soft grounds under train load[J]. Quartly Report of RTTI, 1990, 31: 2935.
[4]Xia H, Zhang N, Gao R. Experimental analysis of railway bridge under highspeed trains[J]. Journal of Sound and Vibration, 2005, 28(2): 517528.
[5]聂志红.高速铁路轨道路基竖向动力响应研究[D]. 长沙: 中南大学土木建筑学院, 2005.
[6]Kerr Arnnold D, Moroney Brain E. Track transition problems and remedies[R]. Bulletin 742American Rail Way Engineering Association,1995: 267698.