Journal of Shanghai Jiaotong University
• Automation Technique, Computer Technology • Previous Articles Next Articles
JIANG Shu-yu,ZHOU Bing-hai
Received:
Revised:
Online:
Published:
Abstract: The minimization of cycle time (CT) and the maximization of throughput rate (TH) are the primary goals of semiconductor wafer manufacturing systems. A heuristic algorithm based on the CONWIP release control policy and G/G/m queueing network model was developed. The algorithm aims at calculating a suitable workinprocess (WIP) level in a semiconductor wafer manufacturing system, and considers the factors that cause the bottleneck machines to depart from regular, predictable process time (bottleneck machines’ process time variability). The results of simulation experiments indicate that, fixing the WIP level calculated by the proposed algorithm in the system can achieve a good combination of CT and TH within a certain scope of bottleneck machines’ process time variability.
CLC Number:
TP 278
JIANG Shu-yu,ZHOU Bing-hai. A WorkinProcess Estimation Method Based on Bottleneck Machines’ Process Time Variability[J]. Journal of Shanghai Jiaotong University.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://xuebao.sjtu.edu.cn/EN/
https://xuebao.sjtu.edu.cn/EN/Y2008/V42/I12/1953