上海交通大学学报 ›› 2021, Vol. 55 ›› Issue (12): 1640-1649.doi: 10.16183/j.cnki.jsjtu.2021.273

所属专题: 《上海交通大学学报》2021年“电气工程”专题 《上海交通大学学报》2021年12期专题汇总专辑

• • 上一篇    下一篇

面向新型电力系统的华东电网运行备用体系构建方法

胡宏1, 陈新仪1, 王利峰1, 滕晓毕1, 严正2(), 徐潇源2, 王晗2   

  1. 1.国家电网公司华东分部,上海 200120
    2.上海交通大学 电力传输与功率变换控制教育部重点实验室,上海 200240
  • 收稿日期:2021-07-30 出版日期:2021-12-28 发布日期:2021-12-30
  • 通讯作者: 严正 E-mail:yanz@sjtu.edu.cn
  • 作者简介:胡 宏(1970-),男,浙江省杭州市人,硕士生,高级工程师,主要从事电力系统运行工作.
  • 基金资助:
    国家电网公司科技项目(SGTYHT/19-JS-214)

Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems

HU Hong1, CHEN Xinyi1, WANG Lifeng1, TENG Xiaobi1, YAN Zheng2(), XU Xiaoyuan2, WANG Han2   

  1. 1. East China Branch of State Grid Corporation of China, Shanghai 200120, China
    2. Key Laboratory of Control of Power Transmission and Conversion of the Ministry of Education, Shanghai Jiao Tong University, Shanghai 200240, China
  • Received:2021-07-30 Online:2021-12-28 Published:2021-12-30
  • Contact: YAN Zheng E-mail:yanz@sjtu.edu.cn

摘要:

为进一步提升华东电网的有功调节能力,从受端特性、新能源发展、净负荷波动、以及电力市场化改革需求等方面分析了新型电力系统建设下构建华东电网运行备用体系的必要性,并结合国内外典型电网运行备用体系的现状,提出了适应华东电网发展的运行备用建议体系,对备用的分类、响应时间和最小备用配置原则进行了重新梳理和修订.最后,通过对华东电网实际运行数据的测算分析,验证了本文所建议的运行备用体系的有效性.

关键词: 运行备用, 华东电网, 最小备用配置, 测算分析

Abstract:

In order to further enhance the active power regulation capacity of East China power grid, this paper analyzes the necessity of constructing an operation reserve system of East China power grid under the new power systems construction from the aspects of receiving end characteristics, new energy development, net load fluctuation, and the demand of power market reform. Furthermore, it proposes an operating reserve proposal system of East China power grid under the new situation based on the status of typical power systems at home and abroad. The suggested operating reserve system reorganizes and revises the principles of reserve classification, response time, and minimum reserve configuration. The results verify the effectiveness of the proposed operating reserve system through the measurement and analysis of the actual operation data of the East China power grid.

Key words: operating reserve, East China power grid, minimum reserve configuration, measurement and analysis