[1]MUBAKO S, LAHIRI S, LANT C. Inputoutput analysis of virtual water transfers: Case study of California and Illinois[J]. Ecological Economics, 2013, 93: 230238.
[2]买亚宗, 孙福丽, 石磊, 等. 基于DEA的中国工业水资源利用效率评价研究[J].干旱区资源与环境, 2014, 28(11): 4247.
MAI Yazong, SUN Fuli, SHI Lei, et al. Evaluation of China’s industrial water efficiency based on DEA model[J]. Journal of Arid Land Resources and Environment, 2014, 28(11): 4247.
[3]唐浩.中国特色新型工业化的新认识[J]. 中国工业经济, 2014 (6): 517.
TANG Hao. The new understanding of new industrialization with Chinese characteristic[J]. China Industrial Economics, 2014 (6): 517.
[4]李德毅, 刘常昱. 论正态云模型的普适性[J]. 中国工程科学, 2004, 6(8): 2834.
LI Deyi, LIU Changyu. Study on the universality of the normal cloud model[J]. Engineering Science, 2004, 6(8): 2834.
[5]董会忠,张峰,宋晓娜.基于正态云模型的科技创新与区域竞争力动态关联评价[J]. 科技进步与对策, 2015, 32(15): 125131.
DONG Huizhong, ZHANG Feng, SONG Xiaona. Dynamic correlation evaluation between scientific and technological innovation and regional competitiveness based on normal cloud model[J]. Science & Technology Progress and Policy, 2015, 32(15): 125131.
[6]DEMADIS K D, MAVREDAKI E, STATHOULOPOULOU A, et al. Industrial water systems: Problems, challenges and solutions for the process industries[J]. Desalination, 2007, 213(1): 3846.
[7]王有森,许皓,卞亦文.工业用水系统效率评价:考虑污染物可处理特性的两阶段DEA[J].中国管理科学, 2016, 24(3): 169176.
WANG Yousen, XU Hao, BIAN Yiwen. Industrial water use system efficiency evaluation: A twostage DEA model considering pollutants disposability[J]. Chinese Journal of Management Science, 2016, 24(3): 169176.
[8]杨贵羽, 甘泓. 最严格水资源管理中综合用 (耗) 水定额指标构建的必要性分析[J]. 中国水利, 2016 (1): 1618.
YANG Guiyu, GAN Hong. Necessity of building water use quota indicator system for implementing the most stringent water resources management system [J]. China Water Resources, 2016 (1): 1618.
[9]张峰,殷秀清,董会忠.组合灰色预测模型应用于山东省碳排放预测[J]. 环境工程, 2015(2): 147152.
ZHANG Feng, YIN Xiuqing, DONG Huizhong. Application of combination grey model in carbon emissions prediction in Shandong province[J]. Environmental Engineering, 2015(2): 147152. |