[1]王顺洪. 中国高速铁路发展及其经济影响分析[J]. 西南交通大学学报: 社会科学版, 2010, 11(5): 6569.WANG Shunhong. The development of chinese highspeed railway and its economic influence [J]. Journal of Southwest Jiaotong University: Social Science, 2010, 11(5):6569.[2]Tzanakakis K. The railway track and its long term behaviour: A handbook for a railway track of high quality[M]. Berlin: Springer Science & Business Media, 2013.[3]林红松. 基于断裂和损伤力学的无砟轨道静动力特性研究[D]. 成都: 西南交通大学土木工程学院, 2009.[4]Bocciolone M, Caprioli A, Cigada A, et al. A measurement system for quick rail inspection and effective track maintenance strategy [J]. Mechanical Systems and Signal Processing, 2007, 21(3): 12421254.[5]赵勐. 基于探地雷达的铁路路基病害识别技术研究[D]. 石家庄:石家庄铁道大学大型结构健康诊断与控制研究所, 2012.[6]陈梦, 冯少孔, 车爱兰, 等. 面波勘探和台阵地脉动观测相结合的地基调查法及其在松江古照壁保护中的应用[J]. 上海交通大学学报, 2013, 47(10): 15571561.CHEN Meng, FENG Shaokong, CHE Ailan. Application of geoinvestigation to Songjiang ancient wall based on surface wave survey and array micro tremor observation[J]. Journal of Shanghai Jiaotong University, 2013, 47(10): 15571561. [7]彭华, 张鸿儒. 铁路路基病害类型机理及检测与整治技术[J]. 工程地质学报, 2005, 13(2):195199.PENG Hua, ZHANG Hongru. Types and mechanisms of road bed defects in existing railways and the IR detection as well as treatment [J]. Journal of Engineering Geology, 2005, 13(2):195199.[8]Osgood B. The Fourier transform and its applications[M].San Francisco: Stanford University Press, 2009. |