[1] |
王承德. 近十年来超长距离顶管发展概况[J]. 特种结构, 1997, 14(4): 16-21.
|
|
WANG Cheng-de. Development of long distance pipe jacking in nearly a decade[J]. Special Structures, 1997, 14(4): 16-21.
|
[2] |
Milligan G W E, Norris P. Site based research in pipe jacking-objectives, procedures and a case history[J]. Tunnelling and Underground Space Technology, 1996, 11(1): 3-24.
|
[3] |
Milligan G W E, Norris P. Pipe-soil interaction during pipe jacking[J]. Geotechnical Engineering, 1999, 137(1): 27-44.
|
[4] |
潘同燕. 大口径急曲线顶管施工力学分析与监测技术研究[D]. 上海: 同济大学, 2000.
|
[5] |
魏纲, 徐日庆, 余剑英, 等. 顶管施工中管道受力性能的现场试验研究[J]. 岩土力学, 2005, 26(8): 1273-1277.
|
|
WEI Gang, XU Ri-qing, YU Jian-ying, et al. Site-based experimental study on pipe behavior during pipe jacking[J]. Rock and Soil Mechanics, 2005, 26(8): 1273-1277.
|
[6] |
王承德. 顶进管道受力分析[J]. 特种结构, 2006, 23(4): 87-89.
|
|
WANG Cheng-de. Analysis of jacking pipe stress[J]. Special Structures, 2006, 23(4): 87-89.
|
[7] |
黄吉龙, 陈锦剑, 王建华, 等. 大口径顶管顶进过程的数值模拟分析[J]. 地下空间与工程学报, 2008, 4(3): 489-493.
|
|
HUANG Ji-long, CHEN Jin-jian, WANG Jian-hua, et al. Numerical analysis of large diameter Pipe-jacking[J]. Chinese Journal of Underground Space and Engineering, 2008, 4(3): 489-493.
|
[8] |
雷晗. 大直径砼顶管工程中土与结构的相互作用分析[D]. 上海: 上海交通大学, 2012.
|
[9] |
CECS 246: 2008,给水排水工程顶管技术规程[S].
|
[10] |
ATV A-161. Structural calculation of drive pipes[S].
|
[11] |
ASCE 27-00. Standard practice for direct design of precast concrete pipe for jacking in trenchless construction[S].
|
[12] |
雷晗, 陈锦剑, 王建华, 等. 大直径砼顶管的管道受力特性分析[J]. 上海交通大学学报, 2011, 45(10): 1493-1497.
|
|
LEI Han, CHEN Jin-jian, WANG Jian-hua, et al. Analysis on performance of large diameter concrete jacking pipe[J]. Journal of Shanghai Jiaotong University, 2011, 45(10): 1493-1497.
|