[1]PARK C, SEO J, KIM J, et al. Assembly block storage location assignment at a shipyard: A case of Hyundai Heavy Industries[J]. Production Planning and Control, 2007, 18(3): 180-189.
[2]PARK C, SEO J. Mathematical modeling and solving procedure of the planar storage location assignment problem[J]. Computers and Industrial Engineering, 2009, 57(3): 1062-1071.
[3]PARK C, SEO J. Comparing heuristic algorithms of the planar storage location assignment problem[J]. Transportation Research Part E: Logistics and Transportation Review, 2010, 46(1): 171-185.
[4]TAO N R, JIANG Z H, QU S P. Assembly block location and sequencing for flat transporters in a planar storage yard of shipyards[J]. International Journal of Production Research, 2013, 51(14): 4289-4301.
[5]张志英, 徐建祥, 计峰. 基于遗传算法的船舶分段堆场调度研究[J]. 上海交通大学学报, 2013, 47(7): 1036-1042.
ZHANG Zhiying, XU Jianxiang, JI Feng. Shipbuilding yard scheduling approach based on genetic algorithm[J]. Journal of Shanghai Jiao Tong University, 2013, 47(7): 1036-1042.
[6]曾建智, 张志英, 邢艳, 等. 基于双层遗传算法的单时间窗分段堆场调度计划与优化[J]. 计算机集成制造系统, 2016, 22(9): 2165-2174.
ZENG Jianzhi, ZHANG Zhiying, XING Yan, et al. Block stockyard scheduling and optimization with single time window based on dual-layer genetic algorithm[J]. Computer Integrated Manufacturing Systems, 2016, 22(9): 2165-2174.
[7]陈凯, 蒋祖华, 刘建峰, 等.带有进场时间窗的船舶分段堆场调度[J]. 上海交通大学学报, 2016, 50(9): 1390-1398.
CHEN Kai, JIANG Zuhua, LIU Jianfeng, et al. Shipbuilding yard scheduling with block inbound time window[J]. Journal of Shanghai Jiao Tong University, 2016, 50(9): 1390-1398.
[8]陶宁蓉, 蒋祖华, 刘建峰, 等. 考虑工艺流程的船体分段多堆场调度问题研究[J]. 河北工业科技, 2017, 34(1): 12-17.
TAO Ningrong, JIANG Zuhua, LIU Jianfeng, et al. Multi-stockyard scheduling problem considering technological process of hull blocks[J]. Hebei Journal of Industrial Science & Technology, 2017, 34(1): 12-17.
[9]孟令通, 蒋祖华, 陶宁蓉, 等. 船舶组合分段堆场调度方法[J]. 上海交通大学学报, 2019, 53(7): 780-788.
MENG Lingtong, JIANG Zuhua, TAO Ningrong, et al. Combined assembly block scheduling in storage yard of shipbuilding[J]. Journal of Shanghai Jiao Tong University, 2019, 53(7): 780-788.
[10]ZHENG J L, JIANG Z B, CHEN Q. Block spatial scheduling modelling and application in shipbuilding[J]. International Journal of Production Research, 2012, 50(10): 2744-2756.
[11]KWON B, LEE G M. Spatial scheduling for large assembly blocks in shipbuilding[J]. Computers & Industrial Engineering, 2015, 89: 203-212.
[12]DAI L, HU H, CHEN F. A GA-based heuristic approach for offshore structure construction spatial scheduling under uncertainty[J]. Ships and Offshore Structures, 2015, 10(6): 660-668.
[13]赵明华. 面向船体曲面分段建造的空间调度及调整算法研究[D]. 上海: 上海交通大学, 2010.
ZHAO Minghua. Study on spatial scheduling and adjustment algorithm oriented to curved block in shipbuilding[D]. Shanghai: Shanghai Jiao Tong University, 2010. |