[1]ZHANG R, LIU Q, ZHANG Y, et al. Study on lean management of carrier rocket final assembly based on the process[J]. Industrial Engineering and Management, 2016, 21(2): 108-111.
[2]APOSTU M V, MEYER M, BENDUL J. Early indication system for critical situations in job-shop production[J]. Procedia CIRP, 2014, 19: 33-38.
[3]KRZHIZHANOVSKAYA V V, SHIRSHOV G S, MELNIKOVA N B, et al. Flood early warning system: Design, implementation and computational modules[J]. Procedia Computer Science, 2011, 4: 106-115.
[4]BEHRENS J, ANDROSOV A, BABEYKO A Y, et al. A new multi-sensor approach to simulation assisted tsunami early warning[J]. Natural Hazards and Earth System Science, 2010, 10(6): 1085-1100.
[5]张云波. 工程项目工期延误原因及预警模型研究[D]. 天津: 天津大学, 2004.
ZHANG Yunbo. The study on the cause of delay and the model of early warning in construction project[D]. Tianjin: Tianjin University, 2004.
[6]KIM B C. Forecasting project progress and early warning of project overruns with probabilistic methods[D]. Texas, USA: Texas A&M University, 2007.
[7]YUAN Z M, WANG Y W, SUN C S. Construction schedule early warning from the perspective of probability and visualization[J]. Journal of Intelligent & Fuzzy Systems, 2017, 32(1): 877-888.
[8]DE BARCELOS TRONTO I F, DA SILVA J D S, SANT’ANNA N. An investigation of artificial neural networks based prediction systems in software project management[J]. Journal of Systems and Software, 2008, 81(3): 356-367.
[9]ZHENG G Z, ZHU N, TIAN Z, et al. Application of a trapezoidal fuzzy AHP method for work safety evaluation and early warning rating of hot and humid environments[J]. Safety Science, 2012, 50(2): 228-239.
[10]HOTZ I, HANISCH A, SCHULZE T. Simulation-based early warning systems as a practical approach for the automotive industry[C]//Proceedings of the 2006 Winter Simulation Conference. Monterey, CA, USA: IEEE, 2006: 1962-1970.
[11]HOPP W J, SPEARMAN M L. Factory physics[M].3rd ed. New York, USA: McGraw-Hill Companies, 2007.
[12]KLUG F. The internal bullwhip effect in car manufacturing[J]. International Journal of Production Research, 2013, 51(1): 303-322.
[13]刘明周, 单晖, 蒋增强, 等.不确定条件下车间动态重调度优化方法[J]. 机械工程学报, 2009, 45(10): 137-142.
LIU Mingzhou, SHAN Hui, JIANG Zengqiang, et al. Dynamic rescheduling optimization of job-shop under uncertain conditions[J]. Journal of Mechanical Engineering, 2009, 45(10): 137-142.
[14]邵晓亮. 面向机械产品制造的项目进度管理技术研究[D]. 武汉: 武汉理工大学, 2015.
SHAO Xiaoliang. The research of project schedule management technology oriented on machinery manufacturing[D]. Wuhan: Wuhan University of Technology, 2015.
[15]CHAWLA N V, BOWYER K W, HALL L O, et al. SMOTE: Synthetic minority over-sampling technique[J]. Journal of Artificial Intelligence Research, 2002, 16: 321-357.
[16]LIAW A, WIENER M. Classification and regression by random forest[J]. R News, 2002, 2(3): 18-22.
[17]TAI Y T, PEARN W L, LEE J H. Cycle time estimation for semiconductor final testing processes with Weibull-distributed waiting time[J]. International Journal of Production Research, 2012, 50(2): 581-592.
[18]GOODFELLOW I, BENGIO Y, COURVILLE A, et al. Deep learning[M]. Cambridge, MA, USA: MIT Press, 2016.
[19]HE H B, GARCIA E A. Learning from imbalanced data[J]. IEEE Transactions on Knowledge and Data Engineering, 2009, 21(9): 1263-1284.
[20]周志华, 杨强. 机器学习及其应用2011[M]. 北京: 清华大学出版社, 2011: 171-191.
ZHOU Zhihua, YANG Qiang. Machine learning and applications 2011[M]. Beijing: Tsinghua University Press, 2011: 171-191.
[21]SUN Y M, KAMEL M S, WANG Y. Boosting for learning multiple classes with imbalanced class distribution[C]//Sixth International Conference on Data Mining. Hong Kong, China: IEEE, 2006: 1-11.
[22]MASSEY JR F J. The Kolmogorov-Smirnov test for goodness of fit[J]. Journal of the American Statistical Association, 1951, 46(253): 68-78.
[23]FAWCETT T. An introduction to ROC analysis[J]. Pattern Recognition Letters, 2006, 27(8): 861-874. |