[1]BARZEGARI G, UROMEIHY A, ZHAO J. Parametric study of soil abrasivity for predicting wear issue in TBM tunneling projects[J]. Tunnelling and Underground Space Technology, 2015, 48(4): 43-57.
[2]GHARAHBAGH E A, MOONEY M, FRANK G, et al. Periodic inspection of gauge cutter wear on EPB TBMs using cone penetration testing[J]. Tunnelling and Underground Space Technology, 2013, 38(9): 279-286.
[3]AMOUN S, SHARIFZADEH M, SHAHRIAR K, et al. Evaluation of tool wear in EPB tunneling of Tehran Metro, Line 7 Expansion[J]. Tunnelling and Underground Space Technology, 2017, 61(1): 233-246.
[4]张厚美, 区希, 易觉. 运用盾构掘进参数跟踪判断滚刀损坏的研究[J]. 现代隧道技术, 2014, 51(4): 121-126.
ZHANG Houmei, OU Xi, YI Jue. Tracking and determination of cutter damage based on the driving parameters of a shield[J]. Modern Tunnelling Technology, 2014, 51(4): 121-126.
[5]张明富, 袁大军, 黄清飞, 等. 砂卵石地层盾构刀具动态磨损分析[J]. 岩石力学与工程学报, 2008, 27(2): 2-7.
ZHANG Mingfu, YUAN Dajun, HUANG Qingfei, et al. Analysis of dynamic abrasion of shield cutters in sandy cobble stratum[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(2): 2-7.
[6]刘招伟, 王百泉, 尚伟. 基于超声波的盾构切刀磨损无线检测系统研究[J]. 隧道建设, 2017, 37(11): 1469-1474.
LIU Zhaowei, WANG Baiquan, SHANG Wei. Study of wireless detection system of shield cutter wear based on ultrasonic[J]. Tunnel Construction, 2017, 37(11): 1469-1474.
[7]Japan Society of Civil Engineers. Standard specifications for tunneling—2006: Shield tunnel[M]. Tokyo: Maruzen, 2007.
[8]LI X C, LI X G, YUAN D J. Application of an interval wear analysis method to cutting tools used in tunneling shields in soft ground[J]. Wear, 2017, 15(12): 21-28.
[9]卢浩, 王明洋, 夏沅谱, 等. 土压平衡盾构刀盘扭矩计算模型[J]. 浙江大学学报(工学版), 2014, 48(9): 1640-1645.
LU Hao, WANG Mingyang, XIA Yuanpu, et al. Calculation model of cutterhead torque for each pressure balance shield[J]. Journal of Zhejiang University (Engineering Science), 2014, 48(9): 1640-1645.
[10]温诗铸, 黄平. 摩擦学原理[M]. 北京: 清华大学出版社, 2002.
WEN Shizhu, HUANG Ping. Principles of Tribology[M]. Beijing: Tsinghua University Press, 2002.
[11]肖敏, 廖少明, 周松. 基于Web的隧道盾构法施工动态监控系统[J]. 上海交通大学学报, 2012, 46(1): 105-108.
XIAO Min, LIAO Shaoming, ZHOU Song. Web-based dynamic monitoring system of shield tunnel construction[J]. Journal of Shanghai Jiao Tong University, 2012, 46(1): 105-108.
[12]李潮, 周宏伟, 左建平, 等. 土压平衡盾构刀盘扭矩计算方法与多因素量化分析[J]. 岩石力学与工程学报, 2013, 32(4): 760-766.
LI Chao, ZHOU Hongwei, ZUO Jianping, et al. Torque calculation method of cutterhead in earth pressure balance shield and quantitative analysis of several influencing factors[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(4): 760-766.
[13]KPPL F, THURO K, THEWES M. Suggestion of an empirical prognosis model for cutting tool wear of hydroshield TBM[J]. Tunnelling and Underground Space Technology, 2015, 49(6): 287-294.
[14]HASSANPOUR J, ROSTAMI J, AZALI S T, et al. Introduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; A case history of Karaj water conveyance tunnel, Iran[J]. Tunnelling and Underground Space Technology, 2014, 43(7): 222-231.
[15]JAKOBSEN P D, LANGMAACK L, DAHL F, et al. Development of the soft ground abrasion tester (SGAT) to predict TBM tool wear, torque and thrust[J]. Tunnelling and Underground Space Technology, 2013, 38(9): 398-408.
[16]GHARAHBAGH E A, ROSTAMI J, TALEBI K. Experimental study of the effect of conditioning on abrasive wear and torque requirement of full face tunneling machines[J]. Tunnelling and Underground Space Technology, 2014, 41(3): 127-136. |