1]Liao S M, Liu J H, Wang R L. Shield tunneling and environment protection in shanghai soft ground[J]. Tunnelling and Underground Space Technology, 2009, 24(4): 454465. [2]廖少明,刘建航. 上海轨道交通盾构隧道施工风险监控指导意见(STBDQ010002)[R]. 上海: 上海申通地铁集团有限公司, 2008. [3]廖少明. 盾构超近距离穿越运营地铁的施工控制研究[R]. 上海: 同济大学. 2005. [4]廖少明,余炎,程致高. 盾尾密封对盾构周边超孔隙水压及正面稳定性的影响分析[J]. 同济大学学报:自然科学版, 2008, 36(2): 172177. LIAO Shaoming, YU Yan, CHENG Zhigao. Effect of shield sealing on stability of workface and seepage field around shield[J]. Journal of Tongji University:Natural Science, 2008, 36(2): 172177. [5]钱七虎, 戎晓力. 中国地下工程安全风险管理的现状、问题及相关建议[J]. 岩石力学与工程学报, 2008,27(4): 649655. QIAN Qihu, RONG Xiaoli. State, issues and relevant recommendations for security risk management of china’s underground engineering[J]. Chinese Journal of Rock Mechanics and Engineering, 2008,27(4): 649655. [6]李希元, 闫静雅, 孙艳萍. 盾构隧道施工工程事故的原因与对策[J]. 地下空间与工程学报, 2005,1(6): 968971. LI Xiyuan, YAN Jingya, SUN Yanping. Reasons and countermeasures of accidents happened during the shield tunnel construction[J]. Chinese Journal of Underground Space and Engineering, 2005,1(6): 968971. [7]杨晨, 张佐汉. 深圳地铁二期工程建设期安全事故分析[J]. 铁道建筑, 2013(1): 4548. YANG Chen, ZHANG Zuohan. Safety accident analysis for second phase projects of Shenzhen metro[J]. Railway Engineering, 2013(1): 4548. [8]Anagnostou G, Kovári K. Face stability conditions with earthpressurebalanced shields[J]. Tunnelling and Underground Space Technology, 1996, 11(2): 165173. [9]Leca E, Dormieux L. Upper and lower bound solutions for the face stability of shallow tunnels in frictional material[J]. Géotechnique, 1990, 40(4): 581606. [10]Mollon G, Dias D, Soubra A H. Face stability analysis of circular tunnels driven by a pressurized shield[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2010, 136(1): 215229. [11]Vermeer P, Ruse N, Marcher T. Tunnel heading stability in drained ground[J]. Felsbau, 2002, 20(6): 818. [12]黄正荣,朱伟,梁精华,等 浅埋砂土中盾构法隧道开挖面极限支护压力及稳定研究[J]. 岩土工程学报, 2006, 74(11): 20052009. HUANG Zhengrong, ZHU Wei, LIANG Jinghua, et al. Study on limit supporting pressure and stabilization of excavation face for shallow shield tunnels in sand[J]. Chinese Journal of Geotechnical Engineering, 2006, 74(11): 20052009. [13]Maynar M J, Rodríguez L E. Discrete numerical model for analysis of earth pressure balance tunnel excavation[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2005, 131(10): 12341242. [14]秦建设. 盾构施工开挖面变形与破坏机理研究[D]. 南京: 河海大学土木与交通学院, 2005. [15]Zhang Z X, Hu X Y, Scoff K D. A discrete numerical approach for modeling face stability in slurry shield tunnelling in soft soils[J]. Computers and Geotechnics, 2011, 38(1): 94104 [16]Chambon P, Corté J F. Shallow tunnels in cohesionless soil: Stability of tunnel face[J]. Journal of Geotechnical Engineering, 1994, 120(7): 11481165. [17]Chen R P, Li J, Kong L G, et al. Experimental study on face instability of shield tunnel in sand[J]. Tunnelling and Underground Space Technology, 2013, 33: 1221. [18]Thorpe J P. Ground movements during tunneling in sand[D]. Canada: Queen’s University, 2007. [19]陈仁朋, 李君, 陈云敏,等. 干砂盾构开挖面稳定性模型试验研究[J]. 岩土工程学报, 2011, 33(1): 117122. CHEN Renpeng, LI Jun, CHEN Yunmin, et al. Largescale tests on face stability of shield tunnelling in dry cohesionless soil[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(1): 117122. [20]Idinger G, Aklik P, Wu W, et al. Centrifuge model test on the face stability of shallow tunnel[J]. Acta Geotechnica, 2011(6): 105117. [21]Cundall P A, Strack O A. Discrete numerical model for granular assemblies[J]. Géotechnique, 1979, 29(1): 4765. [22]史旦达. 单调与循环加荷条件下砂土力学性质细观模拟[D]. 上海: 同济大学土木工程学院, 2007. [23]Itasca Consulting Group. PFC2D version 3.1.User’s manual [M]. Minneapolis, USA: Itasca Consulting Group, 2004. [24]Jiang M J, Konrad J M, Leroueil S. An efficient technique for generating homogeneous specimens for DEM studies[J]. Computers and Geotechnics, 2003, 30(7): 579597. |