[2]麦继婷,关宝树.用Morison方程计算分析悬浮隧道所受波浪力初探[J].石家庄铁道学院学报,2003,16(3):14.
MAI Jiting, GUAN Baoshu. A preliminary calculating analysis of the wave forces on a submerged floating tunnel by applying the Morison equation[J]. Journal of Shijiazhuang Railway Institute, 2003, 16(3): 14.
[3]潘永仁,丁美.大型沉管隧道管段沉放施工技术[J].现代隧道技术, 2004, 41(5): 15.
PAN Yongren, DING Mei. Immersed tunnel sinking pipe construction technology[J]. Modern Tunnelling Technology, 2004, 41(5): 15.
[4]彭红霞,王怀东.仑头生物岛沉管隧道管段浮运方案探讨[J].隧道建设,2007,27(4):8588.
PENG Hongxia,WANG Huaidong. Discussion on tube element towing options for luntoushengwudao immersed tunnel project[J]. Tunnel Construction, 2007,27(4):8588.
[5]詹德新,张乐文,赵成璧,等.大型管节水面浮运及沉放数值模拟和可视化实现[J].武汉理工大学学报:交通科学与工程版,2001,25(1):1620.
ZHAN Dexin, ZHANG Lewen, ZHAO Chengbi, et al. Numcrical simulation and visualization of immersed tube tunnel maneuvering and immersing[J]. Journal of Wuhan University of Technology: Transportation Science &Technology,2001,25(1):1620.
[6]王艳宁,熊刚.沉管隧道技术的应用与现状分析[J].现代隧道技术,2007,44(4):14.
WANG Yanning, XIONG Gang. Application and state of the art of immersed tube tunnels[J]. Modern Tunnelling Technology,2007,44(4):14.
[7]赵思齐.用于沉管施工的实时定位系统开发及应用[D].上海:同济大学土木工程学院,2007.
[8]Aono T, Sumida K, Fujiwara R, et al. Rapid stabilization of the immersed tunnel element[C]∥ Proceedings of the Coastal Structures 2003 Conferenee. Portland, Oregon: ASCE, 2003: 394404.
[9]陈智杰.波浪作用下沉管管段沉放运动的试验与数值研究[D].大连:大连理工大学海岸和近海工程国家重点实验室,2009.
[10]Kasper T, Steenfelt J S, Pedersen L M, et al. Stability of an immersed tunnel in offshore conditions under deepwater wave impact[J]. Coastal Engineering, 2008, 55(9): 753760.