[1]吴宝杰,杨桦. 联合平行地震法和磁法检测预应力混凝土长管桩的长度[J]. 工程质量,2009,27(1):2729. WU Baojie, YANG Hua. Using parallel seismic and magnetic to detect length of prestressed concrete long tube pile [J]. Quality Test, 2009, 27(1):2729. [2]US Department of TransportationFederal Highway Administration. Borehole nondestructive test (NDT) methodsparallel seismic [DB/OL]. (20130103)[20130630]http:∥www.cflhd.gov/resources/agm/engApplications/BridgeSystemSubstructure/212BoreholeNondestMethods.cfm. [3]Huang Y H, Ni S H. Experimental study for the evaluation of stress wave approaches on a group pile foundation [J]. NDT & E International, 2012, 47:134143. [4]陈龙珠, 赵荣欣. 旁孔透射波法确定桩底深度计算方法评价[J]. 地下空间与工程学报, 2010, 6(1): 157161. CHEN Longzhu, ZHAO Rongxin. On determination of pile length with parallel seismic testing for exiting structures [J]. Chinese Journal of Underground Space and Engineering, 2010, 6(1): 157161. [5]杜烨,陈龙珠,马晔. 旁孔透射波法确定桩底深度方法的有限元分析[J]. 防灾减灾工程学报,2012,32(6): 731736. DU Ye, CHEN Longzhu, MA Ye. Determination of pile length using parallel seismic testing with FEM simulation [J]. Journal of Disaster Prevention and Mitigation Engineering, 2012, 32(6): 731736. [6]黄大治,陈龙珠. 旁孔透射波法检测既有建筑物桩基的三维有限元分析[J]. 岩土力学,2008,29(6):15691574. HUANG Dazhi, CHEN Longzhu. 3D finite element analysis of parallel seismic tests for integrity of piles of existing structures [J]. Rock and Soil Mechanics, 2008,29(6):15691574. [7]Zhang J Y, Chen L Z. Selection of pile testing signals for parallel seismic test [J]. Advanced Materials Research, 2012, 368373:20452049. |