[1]刘志春, 李文江, 朱永全, 等. 软岩大变形隧道二次衬砌施作时机探讨[J]. 岩石力学与工程学报, 2008, 27(3): 580588. LIU Zhichun, LI Wenjiang, ZHU Yongquan, et al. Research on construction time of secondary lining in soft rock of largedeformation tunnel [J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(3): 580588. [2]路军富, 王明年, 贾媛媛, 等. 高速铁路大断面黄土隧道二次衬砌施作时机研究[J]. 岩土力学, 2011, 32(3): 843848. LU Junfu, WANG Mingnian, JIA Yuanyuan, et al. Research on construction time of secondary lining of large section loess tunnel for highspeed railway [J].Rock and Soil Mechanics,2011, 32(3): 843848. [3]王中文, 方建勤, 夏才初, 等. 考虑围岩蠕变特性的隧道二衬合理支护时机确定方法[J]. 岩石力学与工程学报, 2010, 29(S1): 32413246. WANG Zhongwen, FANG Jianqin, XIA Caichu, et al. Determination method of supporting time for secondary lining in tunnel considering rock creep behaviors [J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(S1): 32413246. [4]谢锋, 蒋树屏, 李建军. 蠕变围岩隧道二次衬砌支护时间的研究[J]. 地下空间与工程学报, 2006, 2(5): 805808. XIE Feng, JIANG Shuping, LI Jianjun. Research on quadric lining time for creeping rock tunnel [J]. Chinese Journal of Underground Space and Engineering, 2006, 2(5): 805808. [5]王永刚, 任伟中. 软弱围岩的蠕变损伤特性及最佳支护时间[J]. 中国铁道科学, 2007, 28(1): 5055. WANG Yonggang, REN Weizhong. Creep damage characteristics and decision of optimum support time for weak surrounding rock [J]. Chinese Railway Science, 2007, 28(1): 5055. [8]郭瑞, 方勇, 何川. 隧道开挖过程中应力释放及位移释放的相关关系研究[J]. 铁道工程学报, 2010(9): 4650. GUO Rui, FANG Yong, HE Chuan. Study on the correlation between stress release and displacement release during tunnel excavation [J]. Journal of Railway Engineering Society, 2010(9): 4650. [9]夏永旭, 王文正, 胡庆安. 围岩应力释放率对双联拱隧道施工影响研究[J]. 现代隧道技术, 2005, 42(3): 14. XIA Yongxu, WANG Wenzheng, HU Qingan. A study on the effect of the rate of stress relieving of surroundingrocks on the construction of a double arch tunnel [J]. Modern Tunnelling Technology, 2005, 42(3): 14. [10]黄醒春, 陶连金, 曹文贵. 岩石力学[M]. 北京: 高等教育出版社, 2005. [6]王祥秋, 杨林德, 高文华. 软弱围岩蠕变损伤机理及合理支护时间的反演分析[J]. 岩石力学与工程学报, 2004, 23(5): 793796. WANG Xiangqiu, YANG Linde, GAO Wenhua. Creep damage mechanism and back analysis of optimum support time for soften rockmass [J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(5): 793796. [7]张娟, 余舜, 申俊敏. 公路隧道应力释放率对软弱围岩稳定性影响[J]. 土木工程与管理学报, 2012, 29(1): 3540. ZHANG Juan, YU Shun, SHEN Junmin. Effects of stress release rate on stability of soft surrounding rock in Highway Tunnels [J]. Journal of Civil Engineering and Management, 2012, 29(1): 3540. |