[1]Webster S T, Baker K R. Scheduling groups of jobs on a single machine [J]. Operationa Research, 1995, 43(4): 692703. [2]Liaee M M, Emmons H. Scheduling families of jobs with setup times [J]. International Journal of Production Economics, 1997, 51(3): 165176. [3]Wu C C, Lee W C. Singlemachine group scheduling problems with deteriorating setup times and job processing times [J]. International Journal of Production Economics, 2008, 115(1): 128133. [4]Biskup D.Single machine scheduling with learning consideration [J].European Journal of Operational Research, 1999, 115(1):173178. [5]程明宝.工件具有指数学习效应的流水作业调度问题[J]. 暨南大学学报, 2008, 29 (2): 4853. CHENG Mingbao. Flow shop scheduling problem with an exponential learning effect [J]. Journal of Jinan University, 2008, 29 (2): 4853. [6]Kuo W H, Yang D L. Singlemachine group scheduling with a timedependent learning effect [J]. Computers and Operations Research, 2006, 33 (8): 20992112. [7]杨明明.具有学习效应和遗忘效应的间歇批生产的单机排序问题[J]. 枣庄学院学报,2010, 27 (10): 3944. YANG Mingming. Single machine scheduling problems with learning and forgetting effects in intermittent batch production [J]. Journal of Zaozhuang University, 2010, 27 (10): 3944. [8]Pan E S, Liao W Z, Xi L F. Singlemachinebased production scheduling model integrated preventive maintenance planning [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 (14): 365375. [9]马松.设备集成维护管理模式及优化策略研究[D].西安电子科技大学管理科学与工程, 2010.
|