上海交通大学学报(自然版) ›› 2012, Vol. 46 ›› Issue (12): 2003-2008.
陆汉东,何卫平,周旭,李亚杰
收稿日期:
2011-12-26
出版日期:
2012-12-29
发布日期:
2012-12-29
基金资助:
国防基础科研项目(A2720110011)
LU Han-Dong, HE Wei-Ping, ZHOU Xu, LI Ya-Jie
Received:
2011-12-26
Online:
2012-12-29
Published:
2012-12-29
摘要: 针对柔性作业车间的分批调度问题,提出了一种基于禁忌搜索算法的柔性分批调度算法.首先进行批次初始划分;然后利用禁忌搜索算法优化批次加工路线和子批加工顺序;最后在零件子批数不变的前提下,利用批量变化局部搜索进行批量分割的优化,实现了最小化完工时间和机床负荷的调度目标.实例分析结果证明了柔性分批调度算法的可行性、高效性和适用性.
中图分类号:
陆汉东, 何卫平, 周旭, 李亚杰. 基于禁忌搜索的柔性作业车间分批调度[J]. 上海交通大学学报(自然版), 2012, 46(12): 2003-2008.
LU Han-Dong, HE Wei-Ping, ZHOU Xu, LI Ya-Jie. An Integrated Tabu Search Algorithm for the Lot Streaming Problem in Flexible Job Shops[J]. Journal of Shanghai Jiaotong University, 2012, 46(12): 2003-2008.
[1]Pezzella F, Morganti G, Ciaschetti G. A genetic algorithm for the flexible jobshop scheduling problem[J]. Computers & Operations Research, 2008,35(10): 32023212.[2]潘全科,朱剑英.多工艺路线的批量生产调度优化[J].机械工程学报,2004,40(4):3639.PAN Quanke, ZHU Jianying. Optimization method for a jobshop scheduling problem with alternative machines in the batch process [J]. Chinese Journal of Mechanical Engineering,2004,40(4):3639 .[3]Low C Y, Hsu C M, Huang K I. Benefits of lot splitting in jobshop scheduling [J]. International Journal of Advanced Manufacturing Technology, 2004, 24( 9/10): 773780.[4]Jeong H I, Park J W, Leachman R C. A batch splitting method for a job shop scheduling problem in an MRP environment[J]. International Journal of Production Research, 1999, 37(15): 35833598.[5]孙志峻,安进,黄卫清.作业车间多工艺路线批量作业计划优化[J].中国机械工程, 2008,19(2): 183187.SUN Zhijun, AN Jin , HUANG Weiqing. Lot scheduling with multiple process routes in Job Shop[J] . China Mechanical Engineering, 2008, 19(2):183187.[6]白俊杰,龚毅光,王宁生,等.多目标柔性作业车间分批优化调度[J].计算机集成制造系统,2010,16(2):396403.BAI Junjie, GONG Yiguang,WANG Ningsheng,et al. Multiobjective flexible Job Shop scheduling with lotsplitting[J]. Computer Integrated Manufacturing Systems,2010,16(2):396403.[7]王凌.智能优化算法及其应用[M].北京:清华大学出版社,2001:6375.[8]LI Junqing, PAN Quanke, LIANG Yunchia. An effective hybrid tabu search algorithm for multiobjective flexible jobshop scheduling problems[J].Computers & Industrial Engineering, 2010,59(4): 647662.[9]Parviz Fattahi M. Flexible job shop scheduling with tabu search algorithms[J]. The International Journal of Advanced Manufacturing Technology, 2007,32(5/6):563570.[10]Buscher U, SHEN Liji. An integrated tabu search algorithm for the lot streaming problem in job shops [J]. European Journal of Operational Research, 2009,199(2):385399.[11]Yazdani M, Amiri M, Zandieh M. Flexible jobshop scheduling with parallel variable neighborhood search algorithm[J]. Expert Systems with Applications, 2010,37(1):678687.[12]苏子林.车间调度问题及其进化算法分析[J].机械工程学报, 2008,44(8):242247.SU Zilin. Jobshop scheduling problem and its evolution algorithm analysis[J]. Chinese Journal of Mechanical Engineering, 2008,44(8):242247.[13]Kacem I, Hammadi S, BORNE P. Approach by localization and multiobjective evolutionary optimization for flexible jobshop scheduling problems[J]. IEEE Transactions on Systems, Man, and Cybernetics, 2002, 32(1): 113. |
[1] | 刘亚辉, 申兴旺, 顾星海, 彭涛, 鲍劲松, 张丹. 面向柔性作业车间动态调度的双系统强化学习方法[J]. 上海交通大学学报, 2022, 56(9): 1262-1275. |
[2] | 李林晏, 韩爽, 乔延辉, 李莉, 刘永前, 阎洁, 刘海东. 面向高比例新能源并网场景的风光-电动车协同调度方法[J]. 上海交通大学学报, 2022, 56(5): 554-563. |
[3] | 汤洪涛, 王丹南, 邵益平, 赵文彬, 江伟光, 陈青丰. 基于改进候鸟迁徙优化的多目标批量流混合流水车间调度[J]. 上海交通大学学报, 2022, 56(2): 201-213. |
[4] | 陆秋瑜, 于珍, 杨银国, 李力. 考虑源荷功率不确定性的海上风力发电多微网两阶段优化调度[J]. 上海交通大学学报, 2022, 56(10): 1308-1316. |
[5] | 王兴志, 翟海保, 严亚勤, 吴庆曦. 基于数字孪生和深度学习的新一代调控系统预调度方法[J]. 上海交通大学学报, 2021, 55(S2): 37-41. |
[6] | 许凌, 王兴志, 肖林朋. 基于语义特征抓取电网调度事件的检测技术[J]. 上海交通大学学报, 2021, 55(S2): 86-91. |
[7] | 范厚明, 于佳琪, 马梦知, 蒋晓丹, 慈吉利, 翟志伟. 模糊时间窗下多船型不定期船调度与航速联合优化[J]. 上海交通大学学报, 2021, 55(3): 297-310. |
[8] | 吕祥梅, 刘天琪, 刘绚, 何川, 南璐, 曾红. 考虑高比例新能源消纳的多能源园区日前低碳经济调度[J]. 上海交通大学学报, 2021, 55(12): 1586-1597. |
[9] | 王金凤, 陈璐, 杨雯慧. 考虑设备可用性约束的单机调度问题[J]. 上海交通大学学报, 2021, 55(1): 103-110. |
[10] | 蒋小康, 张朋, 吕佑龙, 赵新明, 张洁. 基于混合蚁群算法的半导体生产线炉管区调度方法[J]. 上海交通大学学报, 2020, 54(8): 792-804. |
[11] | 李柏鹤, 蒋祖华, 陶宁蓉, 孟令通, 郑虹. 考虑平板车合作运输的船舶分段堆场间调度[J]. 上海交通大学学报, 2020, 54(7): 718-727. |
[12] | 朱宏伟, 陆志强. 考虑人力资源排班的资源受限项目调度问题建模与优化[J]. 上海交通大学学报, 2020, 54(6): 624-635. |
[13] | 孟令通, 蒋祖华, 陶宁蓉, 刘建峰, 郑虹. 考虑工艺顺序和组合分段的多堆场调度方法[J]. 上海交通大学学报, 2020, 54(4): 331-343. |
[14] | 许显杨,陈璐. 考虑设备可靠性与能耗的平行机调度[J]. 上海交通大学学报, 2020, 54(3): 247-255. |
[15] | 马昌谱,周炳海. 自动存取系统多载量轨道小车避碰调度方法[J]. 上海交通大学学报, 2020, 54(2): 126-134. |
阅读次数 | ||||||
全文 |
|
|||||
摘要 |
|
|||||