Quantify Measuring Method for Combat Unit Mission Focusing on Unsuccess Prevention

Expand
  • (School of Reliability and System Engineering, Beihang University, Beijing 100091, China)

Online published: 2015-08-05

Abstract

To describe the self-adaptive character of combat unit (CU), which may not be able to give precise explanation by conventional mission measurement, we present a measurement method orienting to unsuccess prevention for CU mission. Firstly, the task characteristics of multi-phase and multi-level of CU are explained. On this basis, a hierarchical measuring system including measure of capability deviation, relating to basic task unsuccess and composite task is given by quantifying the disturbance. Based on unified measurement, the basic task unsuccess according to presumable domain from required domain is quantified, and the composite task unsuccess is also quantified. Finally, a case of capability deviation measurement and its impact on overall unsuccess are presented for check.

Cite this article

LI Dan (李 丹), FENG Qiang* (冯 强), WANG Zi-li (王自力), REN Yi (任 羿) . Quantify Measuring Method for Combat Unit Mission Focusing on Unsuccess Prevention[J]. Journal of Shanghai Jiaotong University(Science), 2015 , 20(4) : 458 -463 . DOI: 10.1007/s12204-015-1649-0

References

[1] Yang Shi-xing, Yang Dong-sheng, Zhang Wei-min, et al. Research on method of mission decomposition and task modeling [J]. Fire Control & Command Control,2009, 34(8): 24-29 (in Chinese).
[2] Cao Yu-hua, Feng Shu-xing, Xu Xue-feng. Research on conception representation of operational mission break [J]. Computer Simulation, 2007, 24(8): 1-4 (in Chinese).
[3] Wang Rui, Peng Ying-wu, Li Qing-min, et al. Dynamic mission-oriented two-echelon and two-indenture repairable spare parts optimization for combat units[J]. Systems Engineering and Electronics, 2013, 35(4):761-769 (in Chinese).
[4] Luo Q, Chen M, Yin X, et al. Testing missionoriented network via reliability hierarchical mission network [C]// Proceedings of 2012 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering and The 3rd International Conference on Maintenance Engineering. Chengdu, China:IEEE, 2012: 195-199.
[5] Levitin G, Xing L D, Amari S V, et al. Reliability of non-repairable phased-mission systems with propagated failures [J]. Reliability Engineering and System Safety, 2013, 119: 218-228
[6] L¨u Jian-wei, Yu Peng, Liu Zhong-hua, et al. Phased engineering analysis approach of whole ship’s mission reliability [J]. Shipbuilding of China, 2011, 52(3): 182-189 (in Chinese).
[7] Yang Yu-hang, Feng Yun-cheng, Yu Hong, et al. Simulation based mission reliability calculation methods of complex weapon system [J]. Journal of System Simulation,2002, 14(2): 169-172, 199 (in Chinese).
[8] Wu Li-rong, Wang Jian-hua. Study on models of basic reliability and mission reliability [J]. Modern Manufacturing Engineering, 2004 (5): 24-26 (in Chinese).
[9] Liu Zhen-yu, Ma Xiao-bing, Hong Dong-pao, et al.Mission reliability assessment for battle-plane based on flight profile [J]. Journal of Beijing University of Aeronautics and Astronautics, 2012, 38(1): 59-63 (in Chinese).
[10] Guo Lin-han, Kang Rui. Equipment individual operational unit sustainability parameters research [J].Acta Aeronautica Et Astronautica Sinica, 2009, 30(3):456-461 (in Chinese).
[11] Guo Lin-han, Kang Rui. Individual operational unit sustainability simulation measure model research [J].Journal of System Simulation, 2009, 21(2): 325-329(in Chinese).
[12] Feng Qiang. Measuring and modeling and optimization method of effectiveness for complex materiel system based on multi-agent [D]. Beijing: Department of System Engineering of Engineering Technology, Beihang University, 2009 (in Chinese).
[13] Zhang Yao-hui, Shen Jun, Wang Shao-hua, et al.Evaluation of complex system dependability based on state evaluation [J]. Journal of Academy of Armored Force Engineering, 2011, 23(4): 1-5 (in Chinese).
[14] Li Ling-wei, Zhang Jian-jun, Zhang Tao, et al. Study on model and algorithm for stationary availability evaluation of combat unit [J]. Acta Armamentar II, 2010,31(6): 870-875 (in Chinese).
[15] Xie W, Liao H T, Jin T D. Maximizing system availability through joint decision on component redundancy and spares inventory [J]. European Journal of Operational Research, 2014, 237: 164-176.
Options
Outlines

/