构建灾害风险图谱提高电力系统安全调度能力
|
|
解大, 李子怡, 田洲, 王凯
|
Disaster Risk Mapping for Improving Power System Security Dispatch
|
|
XIE Da, LI Ziyi, TIAN Zhou, WANG Kai
|
|
表1 新英格兰10机39节点部分输电线路危险队列
|
Tab.1 Risk priority ranking of selected transmission lines in New England 10-generator 39-bus system
|
|
| 工况 | 线路 | 信息 量值 | 危险 系数 | 极限功率/ MW | 重载功率/ MW | | 1 | 2—3 | 7.2614 | 0.8309 | 500 | 400 | | 2 | 1—2 | 6.6164 | 0.7494 | 600 | 480 | | 3 | 2—25 | 5.0888 | 0.5869 | 500 | 400 | | 4 | 3—4 | 5.0374 | 0.5821 | 500 | 400 | | 5 | 4—14 | 5.0144 | 0.5800 | 500 | 400 | | 6 | 28—29 | 4.7828 | 0.5589 | 600 | 480 | | 7 | 16—21 | 4.1586 | 0.5058 | 600 | 480 | | 8 | 22—23 | 4.1586 | 0.5058 | 600 | 480 | | 9 | 17—18 | 4.0624 | 0.4980 | 600 | 480 | | 10 | 2—30 | 3.9272 | 0.4874 | 900 | 720 |
|
|
|