区域多主体综合能源系统电压偏差异步协调控制方法 |
鲁斌, 王伊晓, 濮川苘, 陈云辉, 陈波波, 樊飞龙 |
Asynchronous Coordinated Control Method for Regional Multi-Agent Integrated Energy Systems Considering Voltage Deviation |
LU Bin, WANG Yixiao, PU Chuanqing, CHEN Yunhui, CHEN Bobo, FAN Feilong |
图3 所提目标规划解与帕累托端面 |
Fig.3 Proposed objective programming solution and Pareto surface |
![]() |