Processing math: 100%

生产调度与可靠性耦合的变工况再制造系统维护建模
肖常胜, 周晓军, 祝米鑫

Maintenance Modeling of Remanufacturing Systems in Variable Working Condition with Coupling of Production Scheduling and Reliability
XIAO Changsheng, ZHOU Xiaojun, ZHU Mixin
表4 产品生产利润、回收成本和回收量
Tab.4 Production margins, recovery costs, and recovery volumes of products
i Ppri/元 cpci/元 ri
1 281 318 N(431, 45.32)
2 289 318 N(222, 54.12)
3 312 329 N(318, 35.62)