k-out-of-n系统机会维护与库存控制多层级优化策略
|
曹蕾, 安向昕, 夏唐斌, 郑美妹, 奚立峰
|
Multi-Level Optimization Policy of Opportunistic Maintenance and Inventory Control of k-out-of-n System
|
CAO Lei, AN Xiangxin, XIA Tangbin, ZHENG Meimei, XI Lifeng
|
|
表7 不同策略下的维护外包服务总成本对比
|
Tab.7 Comparison of total cost of different policies
|
|
成本/美元 | SMP+(S, s) S=3 s=2 | OM | | IC | | Joint Opt | OMICP | OM+(S,s) S=2 s=1 | OM+(S,s) S=3 s=2 | IPM+IC | SMP+IC | 2014 RESS 文献[16] | 2021 EJOR 文献[15] | CD | 80 365 | 56 920 | 51 420 | | 79 130 | 73 430 | | 78 555 | 79 421 | 56 480 | CP | 163 500 | 176 700 | 172 780 | | 159 540 | 130 800 | | 163 500 | 163 500 | 172 780 | CR | 128 865 | 116 220 | 90 340 | | 132 740 | 176 050 | | 116 315 | 123 591 | 85 780 | CB | 63 000 | 15 000 | 12 000 | | 5 400 | 147 000 | | 35 400 | 37 350 | 12 000 | CF | 100 000 | 62 400 | 60 000 | | 38 400 | 20 400 | | 96 000 | 10 280 | 38 400 | CU | 166 500 | 171 000 | 169 000 | | 170 000 | 151 500 | | 149 350 | 157 800 | 156 000 | CH | 157 501 | 170 932 | 236 470 | | 214 069 | 86 292 | | 80 500 | 149 125 | 132 673 | CE | 21 000 | 42 000 | 22 400 | | 17 500 | 24 500 | | 41 090 | 6 860 | 23 800 | 维护相关成本 | 355 365 | 364 840 | 326 540 | | 376 810 | 527 280 | | 393 770 | 403 862 | 327 040 | 库存相关成本 | 445 001 | 446 332 | 487 870 | | 439 969 | 282 692 | | 366 940 | 324 065 | 350 873 | 总成本 | 880 731 | 811 172 | 814 410 | | 816 779 | 809 972 | | 760 710 | 727 927 | 677 913 |
|
|
|