双线平行顶管上跨地铁盾构隧道施工环境影响实测分析
应宏伟, 姚言, 王奎华, 张昌桔

Observed Environment Response Caused by Construction of Double-Line Parallel Pipe Jacking Crossing over Metro Shield Tunnels
YING Hongwei, YAO Yan, WANG Kuihua, ZHANG Changju
图10 西线顶管上方地表沉降随时间变化
Fig.10 Time-dependent surface settlements above the pipe jacking of the western line