双线平行顶管上跨地铁盾构隧道施工环境影响实测分析
应宏伟, 姚言, 王奎华, 张昌桔

Observed Environment Response Caused by Construction of Double-Line Parallel Pipe Jacking Crossing over Metro Shield Tunnels
YING Hongwei, YAO Yan, WANG Kuihua, ZHANG Changju
表2 单线顶管Peck法横向地面沉降拟合参数
Tab.2 Transverse surface settlement fitting parameters of Peck formula of single-line pipe jacking
断面 Smax/mm i/m K η/%
DBC-1 34.78 2.60 0.63 1.65
DBC-2 26.89 3.17 0.77 1.56
DBC-3 29.64 3.40 0.82 1.84
DBC-4 31.53 3.35 0.81 1.93
DBC-5 18.14 3.71 0.90 1.23
DBC-6
DBC-7 19.2 3.47 0.84 1.22
平均 26.7 3.28 0.79 1.60