Processing math: 100%

考虑维修效果差异性的顺序预防性维修策略
黎新龙, 冉琰, 张根保, 何彦

Sequential Preventive Maintenance Strategy Considering Difference of Maintenance Effect
LI Xinlong, RAN Yan, ZHANG Genbao, HE Yan
表1 损伤类故障最小维修成本 c1m对最优维修策略的影响
Tab.1 Influence of minimal maintenance cost c1m of damage-type failures on optimal maintenance strategy
c1m/元 C*/(元·h-1) N* 维修间隔时间序列,x1,…,xk/h 更新周期长度/h
10 4.94 3 562.29, 354.81, 269.32 1 186.42
20 6.33 4 411.04, 268.80, 208.41, 170.22 1 058.46
30 7.54 5 332.41, 221.08, 173.26, 142.59, 118.94 988.28
40 8.64 5 283.04, 190.11, 149.95, 123.98, 103.79 850.87
50 9.67 5 248.68, 168.11, 133.17, 110.46, 92.69 753.10
60 10.65 6 223.14, 151.53, 120.41, 100.1, 84.145, 70.46 749.80
70 11.58 6 203.29, 138.52, 110.33, 91.88, 77.33, 64.82 686.17
80 12.45 6 187.34, 127.98, 102.12, 85.16, 71.75, 60.19 634.53
90 13.33 6 174.18, 119.24, 95.284, 79.54, 67.08, 56.31 591.64
100 14.16 6 163.12, 111.86, 89.49, 74.77, 63.10, 53.00 555.33