考虑地区发展阶段不确定性的电网投资决策鲁棒优化
黄琬迪, 张沈习, 程浩忠, 陈丹, 翟晓萌, 吴霜

Robust Optimization of Power Grid Investment Decision-Making Considering Regional Development Stage Uncertainties
HUANG Wandi, ZHANG Shenxi, CHENG Haozhong, CHEN Dan, ZHAI Xiaomeng, WU Shuang
表6 不同鲁棒区间宽度下的投资决策净利润
Tab.6 Net profit of investment decision-making at different robust interval widths
年份 投资决策净利润/亿元
γ=0 γ=0.05 γ=0.1 γ=0.15 γ=0.2
2020 57.514 57.719 57.536 57.241 56.324
2021 58.502 58.598 58.403 58.094 57.080
2022 59.483 59.535 59.334 59.003 57.941
2023 60.454 60.538 60.332 60.006 58.922
2024 61.417 61.605 61.395 61.066 60.018
2025 62.414 62.732 62.533 62.203 61.194
2026 63.282 63.855 63.700 63.373 62.471
2027 64.162 61.361 60.725 59.612 57.757
总计 651.879 649.001 644.620 641.418 629.283