考虑地区发展阶段不确定性的电网投资决策鲁棒优化
黄琬迪, 张沈习, 程浩忠, 陈丹, 翟晓萌, 吴霜

Robust Optimization of Power Grid Investment Decision-Making Considering Regional Development Stage Uncertainties
HUANG Wandi, ZHANG Shenxi, CHENG Haozhong, CHEN Dan, ZHAI Xiaomeng, WU Shuang
表3 地区发展阶段及容载比上下限划分结果
Tab.3 Division results of regional development stage and upper and lower limits of capacitive-to-load ratio
地区 t1 t2 t3 容载比上下限
A 1994 2015 2031 1.7~2.0
B 1998 2016 2035 1.7~2.0
C 1990 2011 2030 1.6~1.9
D 1987 2006 2025 1.6~1.9
E 1990 2010 2026 1.6~1.9
F 1982 2008 2030 1.6~1.9
G 1992 2012 2030 1.6~1.9
H 1987 2010 2037 1.7~2.0
I 1997 2016 2032 1.6~1.9
J 1983 2010 2034 1.7~2.0
K 1977 2012 2046 1.8~2.1
L 1990 2014 2040 1.7~2.0
M 2000 2015 2030 1.6~1.9