面向新型电力系统的华东电网运行备用体系构建方法 |
胡宏, 陈新仪, 王利峰, 滕晓毕, 严正, 徐潇源, 王晗 |
Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems |
HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han |
图4 负荷预测偏差占预测最大负荷比例的累积概率分布 |
Fig.4 CDF of proportion of load forecasting deviation to maximum predicted load |