面向新型电力系统的华东电网运行备用体系构建方法 |
胡宏, 陈新仪, 王利峰, 滕晓毕, 严正, 徐潇源, 王晗 |
Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems |
HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han |
图2 美国PJM电网备用需求相对预测最大负荷的比例 |
Fig.2 Proportion of operating reserve requirement to maximum predicted load for PJM grid of America |