Three Dimensional Numerical Analysis of Pressurized Underground Explosion

Expand
  • School of Naval A rchitecture, Ocean and Civil Engineering, Shanghai Jiaotong University, Shanghai 200240, China

Received date: 2009-01-08

  Online published: 2021-04-25

Abstract

Short-delay blasting was used in a pipe-jacking tunnel in order to pass through rock stratum. And three-dimensional finite element numerical analysis on the influence of the blasting to bored machine and surrounding ground was carried out. The effects of different ground conditions, different clogged lengths were carefully analyzed in the numerical analysis. The analysis results indicate that shock and vibration of blasting on the bored machine reduce with the increase of clogged length. An appropriate clogged length can evidently decrease the influence of blasting on the machine. The blasting vibration on the surrounding rock of full rock face is smaller than that of half rock face condition.The influence of central hole is smaller than that of peripheral hole.

Cite this article

CHEN Nan, XIA Xiao-he, YE Guan-lin, WANG Jian-hua . Three Dimensional Numerical Analysis of Pressurized Underground Explosion[J]. Journal of Shanghai Jiaotong University, 2009 , 43(10) : 1581 -1584 . DOI: 10.16183/j.cnki.jsjtu.2009.10.014

References

[1] 杨小林, 王梦恕, 王树仁.爆破对岩体基本质量的影响及试验研究[J]. 岩土工程学报, 2000, 22(4): 461-464.
[1] YANG Xiao-lin, WANG Meng-shu, WANG Shu-ren. Blasting effects on basic quality of rock mass and its experimental investigation[J]. Chinese Journal of Geotechnical Engineering, 2000, 22(4): 461-464.
[2] 王礼立.爆炸力学数值模拟中本构建模问题的讨论[J]. 爆炸与冲击, 2003, 23(2): 97-104.
[2] WANG Li-li. On constitutive modeling in numerical simulation of explosion mechanics[J]. Explosion and Shock Waves, 2003, 23(2): 97-104.
[3] 李海波, 蒋会军, 赵坚, 等.动荷载作用下岩体工程安全的几个问题[J]. 岩石力学与工程学报, 2003, 22(11): 1887-1891.
[3] LI Hai-bo, JIANG Hui-jun, ZHAO Jian, et al. Some problems about safety analysis of rock engineering under dynamic load[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(11): 1887-1891.
[4] 杨军, 金乾坤, 黄风雷.岩石爆破理论模型及数值计算[M]. 北京: 科学出版社, 1999.
[5] 吴德伦, 叶晓明.工程爆破安全振动速度综合研究[J]. 岩石力学与工程学报, 1997, 16(3): 266-273.
[5] WU De-lun, YE Xiao-ming. A comprehensive review and commendation of blast vibration safety velocity[J]. Chinese Journal of Rock Mechanics and Engineering, 1997, 16(3): 266-273.
[6] 罗勇, 沈兆武.炮孔合理堵塞长度的研究[J]. 岩土工程技术, 2006, 20(1): 72-74.
[6] LUO Yong, SHEN Zhao-wu. Study on stemming length in hole charged blasting[J]. Geotechnical Engineering Technique, 2006, 20(1): 72-74.
Outlines

/