Relay board is taken as the output driving part of the reactor protection system in one nuclear power plant. The third periodic test of the reactor protection system is done during factory test, and the phenomenon is discovered that the relay board issues trigger signals last about 20ms when the bypass of the safety trigger cabinet switches from bypass position to normal position. The influence of the transient trigger signal on the normal operation of the nuclear power unit is analyzed. The third periodic test principle of protection system is analyzed combined with the internal structure of relay board,and the relay jumping as the reason of false triggering is concluded. The problem is solved by adding the solid state timer without changing the original structure of relay board. It provides a reference for the similar design of the following reactor protection system.
LIU Yan,LEI Chuan,GUO Meng
. Relay Board Jump of Reactor Protection System in
One Nuclear Power Plant[J]. Journal of Shanghai Jiaotong University, 2019
, 53(Sup.1)
: 45
-50
.
DOI: 10.16183/j.cnki.jsjtu.2019.S1.008
[1]中华人民共和国国家质量监督检验检疫总局, 中国国家标准化管理委员会.核电厂安全系统定期试验与监测: GB/T 5204-2008[S].北京: 中国标准出版社, 2008.
General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China, The Standardization Administration of China. Periodic tests and monitoring of the safety system of nuclear power plant: GB/T 5204-2008[S].Beijing: Standards Press of China, 2008.
[2]国家核安全局.核电厂安全重要物项的监督(HAD103/09)[DB/OL]. (1994-01-01) [2019-12-10]. https://doc.mbalib.com/view/61f517131b38-bbf68c717460054b333a.html.
National Nuclear Safety Administration. Supervision of important safety items of nuclear power plant (HAD103/09) [DB/OL]. (1994-01-01) [2019-12-10]. https://doc.mbalib.com/view/61f517131b38-bbf68c717460054b333a.html.