Aimed at service-oriented manufacturing model and outsourcing paradigm, an opportunistic maintenance strategy based on capacity balancing is proposed to meet the demand of complex series-parallel structure and multi-process, eventually maximizing the leasing profits. The series and parallel structures are taken as the research emphasis. And the capacity balancing of the whole system is also considered. Sequential maintenance scheduling for each machine with individual health evolution aims to minimize the maintenance cost rate. At the process layer and the system layer, these maintenance time points are taken as combined maintenance opportuuity. A capacity balancing-oriented leasing profit optimization (CB-LPO) policy is also developed by considering the capacity balancing to dynamically optimize maintenance decisions. In this study, by comparing with the global maintenance scheme during the lease contract period, it is verified that the proposed strategy has significant economic advantages in service outsourcing decision-making.
SUN Bowen,GUO Wenyu,XIA Tangbin,PAN Ershun,XI Lifeng
. Capacity Balancing-Oriented Leasing Profit Optimization of
Opportunistic Maintenance for Leased Series-Parallel Production System[J]. Journal of Shanghai Jiaotong University, 2019
, 53(3)
: 276
-284
.
DOI: 10.16183/j.cnki.jsjtu.2019.03.004
[1]YANG L, ZHAO Y, PENG R, et al. Hybrid preventive maintenance of competing failures under random environment[J]. Reliability Engineering & System Safety, 2018, 174: 130-140.
[2]郝虹斐, 郭伟, 桂林, 等. 非完美维修情境下的预防性维修多目标决策模型[J]. 上海交通大学学报, 2018, 52(5): 518-524.
HAO Hongfei, GUO Wei, GUI Lin, et al. A multi-objective preventive maintenance decision-making model for imperfect repair process[J]. Journal of Shanghai Jiao Tong University, 2018, 52(5): 518-524.
[3]LU Z Q, CUI W W, HAN X L. Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty [J]. Computers & Industrial Engineering, 2015, 80: 236-244.
[4]TAO X Y, XIA T B, XI L F. Environment factor-based equipment hazard rate prognosis for maintenance scheduling[J]. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 2017, 231(8): 1488-1497.
[5]SCHUTZ J, REZG N. Maintenance strategy for leased equipment[J]. Computers & Industrial Engineering, 2013, 66(3): 593-600.
[6]HAJEJ Z, REZG N, GHARBI A. A decision optimization model for leased manufacturing equipment with warranty under forecasting production/maintenance problem[DB/OL]. [2018-06-14]. http://dx.doi.org/10.1155/2015/274530.
[7]ISKANDAR B P, HUSNIAH H. Optimal preventive maintenance for a two dimensional lease contract[J]. Computers & Industrial Engineering, 2017, 113: 693-703.
[8]XIA T B, XI L F, PAN E S, et al. Reconfiguration-oriented opportunistic maintenance policy for reconfigurable manufacturing systems[J]. Reliability Engineering & System Safety, 2017, 166: 87-98.
[9]张晓文, 孙小明, 蒋祖华, 等. 考虑生产线平衡的串-并联生产系统机会维护策略[J]. 上海交通大学学报, 2015, 49(5): 702-707.
ZHANG Xiaowen, SUN Xiaoming, JIANG Zuhua, et al. Opportunistic preventive maintenance strategy for series-parallel system considering line balancing[J]. Journal of Shanghai Jiao Tong University, 2015, 49(5): 702-707.
[10]KHATAB A, AGHEZZAF E H, DIALLO C, et al. Selective maintenance optimisation for series-parallel systems alternating missions and scheduled breaks with stochastic durations[J]. International Journal of Production Research, 2017, 55(10): 3008-3024.
[11]张博文, 陆志强, 张岳君. 并行机系统生产计划与预防性维护联合建模[J]. 上海交通大学学报, 2015, 49(4): 564-571.
ZHANG Bowen, LU Zhiqiang, ZHANG Yuejun. An integrated model of production planning and preventive maintenance for parallel systems[J]. Journal of Shanghai Jiao Tong University, 2015, 49(4): 564-571.
[12]XIA T B, XI L F, PAN E S, et al. Lease-oriented opportunistic maintenance for multi-unit leased systems under product-service paradigm[J]. Journal of Manufacturing Science and Engineering, 2017, 139(7): 071005.