考虑后续工序且批处理工序数为2的批综合调度算法
谢志强1, 2, 刘长海1, 杨静2
Batch Integrated Scheduling Algorithm Considering Posterior Operations and with Constraint of 2 Operations Batches Processing
XIE Zhi-Qiang-1, 2 , LIU Chang-Hai-1, YANG Jing-2
上海交通大学学报(自然版) . 2012, (11): 1746 -1752 .