冷箱温度约束下港口AGV作业与充电两阶段协调优化方法

展开
  • 1.云南交投富宁港投资建设有限公司;2. 武汉理工大学自动化学院,湖北武汉 430000;3.中交第二航务工程勘察设计院有限公司;4.上海交通大学电气工程学院,上海 200240
杨松(1990—),研究生,从事港口运行管理研究。
王枭,副教授;E-mail:xwang90@whut.edu.cn。

网络出版日期: 2026-10-11

基金资助

国家重点研发计划资助项目(2024YFB4303502)

Two-Stage Coordinated Optimization Method for Port AGV Operations and Charging under Reefer Container Temperature Constraints

Expand
  • 1. Yunnan Communications Investment Funing Port Investment & Construction Co., Ltd.;2. School of Automation, Wuhan University of Technology, Wuhan, Hubei, China;3. China Communications Construction Company Second Harbor Consultants Co., Ltd; 4. Shanghai Jiaotong University, Shanghai, China.

Online published: 2026-10-11

摘要

在自动化集装箱码头中,自动导引车(Automated Guided Vehicle,AGV)的作业调度与充电决策具有显著的时空耦合特征。当AGV承担冷藏集装箱运输任务时,冷箱因外接电源中断而处于断电状态,其在途时间和运输距离将直接影响箱内温度及货物品质安全。针对上述问题,提出一种考虑冷藏集装箱温度安全的AGV作业与充电分层协调优化方法。第一阶段以集装箱水平运输总距离最小为目标,在满足岸桥处理能力、堆场容量、作业需求及冷箱允许温升等约束的条件下,优化岸桥—堆场匹配关系和不同类型集装箱的箱流分配。第二阶段根据第一阶段形成的运输需求、空间位置及运输距离,协调优化AGV任务执行、工作—充电—空闲状态、充电桩匹配和电池能量变化,并协调包含光伏、风电及储能系统的港口微电网运行,分别设置港区购电成本最小和净负荷峰谷差最小两类能源调度场景。算例结果表明,冷箱温度约束能够有效限制断电运输过程中的温升,并对堆场分配、运输距离及调度可行域产生实质影响;AGV充电与储能系统的协调调度能够引导负荷向低电价或低负荷时段转移,降低港区运行成本和负荷波动。所提出方法可在保障冷藏集装箱运输安全和AGV作业连续性的同时,提高港口物流与能源系统的协调运行水平。

本文引用格式

杨松, 岳思晨, 王枭, 田鑫, 文书礼 . 冷箱温度约束下港口AGV作业与充电两阶段协调优化方法[J]. 上海交通大学学报, 0 : 1 . DOI: 10.16183/j.cnki.jsjtu.2026.094

Abstract

In automated container terminals, the operational scheduling and charging decisions of automated guided vehicles (AGV) exhibit significant spatiotemporal coupling. When AGV transport reefer containers, the containers remain unpowered because of interruptions to the external power supply, and their transit time and transportation distance directly affect the internal temperature and cargo quality and safety. To address this problem, a hierarchical coordinated optimization method for AGV operations and charging considering reefer-container temperature safety is proposed. In the first stage, the matching relationships between quay cranes and yard blocks and the flows of different container types are optimized to minimize the total horizontal transportation distance, subject to quay-crane handling capacity, yard capacity, operational demand, and allowable reefer temperature-rise constraints. In the second stage, based on the transportation demand, spatial locations, and travel distances determined in the first stage, AGV task execution, operating–charging–idle states, charging-pile assignments, and battery energy evolution are jointly optimized in coordination with a port microgrid incorporating photovoltaic generation, wind power, and energy storage systems. Two energy-scheduling scenarios are considered: minimizing the port’s electricity procurement cost and minimizing the peak-to-valley difference of the net load. The numerical results demonstrate that the reefer temperature constraint effectively limits temperature increases during unpowered transportation and has a substantial influence on yard allocation, transportation distance, and scheduling feasibility. The coordinated scheduling of AGV charging and energy storage shifts loads toward low-price or low-load periods, thereby reducing port operating costs and load fluctuations. The proposed method enhances the coordinated operation of port logistics and energy systems while ensuring reefer-container transportation safety and the continuity of AGV operations.
文章导航

/

〈 〉